Approval and Promulgation of Air Quality Implementation Plans: Illinois; CILCO (AmerenEnergy) Edwards

Federal Register: November 10, 2008 (Volume 73, Number 218)

Rules and Regulations

Page 66555-66559

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr10no08-19

ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52

EPA-R05-OAR-2004-IL-0003; FRL-8730-4

Approval and Promulgation of Air Quality Implementation Plans;

Illinois; CILCO (AmerenEnergy) Edwards

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

SUMMARY: EPA is responding to comments and taking final action on a

July 29, 2003, site-specific sulfur dioxide (SO2) State

Implementation Plan revision request for the Central Illinois Light

Company E.D. Edwards Generating Station, now known as AmerenEnergy

Resources Generating Company, Edwards Power Plant, in Peoria County,

Illinois. This request amends the facility's emission limits to allow a higher SO2emission limit for one of its boilers. To offset this increase, the revised rule includes a group limit for the facility's three boilers which is

Page 66556

lower than the individual boiler emission limits. The revised rule retains the facility's existing cap on total SO2emissions.

Illinois' July 29, 2003, submittal was identical to a State variance which EPA had approved as a temporary revision on April 13, 2000. On

November 12, 2004, EPA approved the July 29, 2003, permanent rule revision submittal as a direct final action. However, on December 13, 2004, EPA received an adverse comment on its approval. EPA withdrew the direct final approval on January 11, 2005. As stated in the January 11, 2005, withdrawal, EPA is not establishing a second comment period on this action.

DATES: This final rule is effective on December 10, 2008.

ADDRESSES: EPA has established a docket for this action under Docket ID

No. EPA-R05-OAR-2004-IL-0003. All documents in the docket are listed on the http://www.regulations.gov Web site. Although listed in the index, some information is not publicly available, i.e., Confidential Business

Information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through http://www.regulations.gov or in hard copy at the Environmental Protection Agency, Region 5, Air and Radiation

Division, 77 West Jackson Boulevard, Chicago, Illinois 60604. This facility is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding Federal holidays. We recommend that you telephone Mary

Portanova, Environmental Engineer, at (312) 353-5954 before visiting the Region 5 office.

FOR FURTHER INFORMATION CONTACT: Mary Portanova, Environmental

Engineer, Criteria Pollutant Section, Air Programs Branch (AR-18J),

Environmental Protection Agency, Region 5, 77 West Jackson Boulevard,

Chicago, Illinois 60604, (312) 353-5954, portanova.mary@epa.gov.

SUPPLEMENTARY INFORMATION: Throughout this document whenever ``we,''

``us,'' or ``our'' is used, we mean EPA. This supplementary information section is arranged as follows:

  1. Background

  2. What has changed in the Illinois SO2SIP?

  3. What comments did EPA receive, and how does EPA respond?

  4. What action is EPA taking?

  5. Statutory and Executive Order Reviews

  6. Background

    On July 29, 2003, Illinois submitted a site-specific SO2

    State Implementation Plan (SIP) revision request for the Central

    Illinois Light Company, in Bartonville, Peoria County, Illinois (CILCO

    Edwards). The facility is now known as AmerenEnergy Resources

    Generating Company, Edwards Power Plant. The SIP revision request, which amended CILCO (AmerenEnergy) Edwards' SO2emission limits, was identical to an earlier temporary SIP revision, which EPA approved on April 13, 2000 (65 FR 19838). Therefore, on November 12, 2004 (69 FR 65378), EPA approved the July 29, 2003, permanent SIP revision request as a direct final action. However, on December 13, 2004, EPA received adverse comments on the action. EPA withdrew the direct final approval on January 11, 2005 (70 FR 1824). The adverse comments and EPA's responses are given in section III below.

  7. What has changed in the Illinois SO2SIP?

    CILCO (AmerenEnergy) Edwards operates three boilers, numbered 1, 2, and 3. Its SO2emission limits are codified at 35 Illinois

    Administrative Code (IAC) 214.561. Previously, the Illinois

    SO2SIP limited the emissions from Boilers 1 and 3 to 6.6 pounds of SO2per million British Thermal Units (lb/MMBtu) and Boiler 2's emissions to 1.8 lb/MMBtu (See 35 IAC 214.141). The July 29, 2003, SIP revision request incorporated rule changes which were identical to the limits in the variance submitted on May 21, 1999, and approved by EPA on April 13, 2000. The average SO2emissions from Boilers 1, 2, and 3, as a group, may not exceed 4.71 lb/MMBtu actual heat input. The average SO2emissions from any one boiler may not exceed 6.6 lb/MMBtu actual heat input. CILCO

    (AmerenEnergy) Edwards must determine compliance with these limits on a daily basis using the SO2methodology of the Phase II Acid

    Rain program set forth in 40 CFR part 75. A plantwide SO2 emission limit for CILCO (AmerenEnergy) Edwards restricts Boilers 1, 2, and 3, as a group, to 34,613 pounds SO2per hour (lb/hr) on a 24-hour average. Compliance with the plantwide limit must also be determined on a daily basis using the Phase II Acid Rain methodology.

  8. What comments did EPA receive, and how does EPA respond?

    EPA received one set of comments from Heart of Illinois Sierra

    Club, dated December 13, 2004, which disagreed with EPA's direct final action.

    Comment: The commenter cited that in 2004, the Environmental

    Integrity Project ranked CILCO (AmerenEnergy) Edwards 47th in the

    United States for SO2emissions. The commenter also stated that the CILCO (AmerenEnergy) Edwards facility ``emits approximately 13% of the state's SO2emissions and lacks even rudimentary pollution controls. The proposed emission rate of 4.71 lb/MMBtu reflects the facility's refusal to install pollution controls and is at least 4 times higher than the limits proposed for new coal-fired power plants.''

    Response: EPA notes that the Environmental Integrity Project's report from May 2004 does rank CILCO (AmerenEnergy) Edwards as 47th in the nation by total tons per year of SO2. The report also shows that the twelve power plants with the highest SO2 emissions in the United States emitted more than twice CILCO

    (AmerenEnergy) Edwards' SO2emissions, in tons per year.

    Illinois' Annual Air Quality Report for 2003 (IEPA/BOA/04-019, August 2004) indicated that the State's total point source SO2 emissions for 2003 were 512,320.6 tons per year (tpy), and the total

    SO2emissions from external fuel combustion electric generation sources were 348,602.0 tpy (Table C4). Total fuel combustion

    SO2emissions were estimated in the report as 414,050.0 tpy

    (Table 8). CILCO (AmerenEnergy) Edwards' 55,035 tpy SO2for 2003 would be 10.7%, 15.8%, and 13.3% of these totals, respectively.

    EPA agrees that CILCO (AmerenEnergy) Edwards is a large facility with significant SO2emissions. Its boilers have control systems for nitrogen oxides and particulate matter, but not for SO2.

    As part of the variance in 1999, the Illinois Pollution Control Board required CILCO (AmerenEnergy) Edwards to research and report on techniques to control its SO2emissions. CILCO

    (AmerenEnergy) Edwards reported that installing flue gas desulfurization systems to control SO2would be both economically and technically infeasible. The CILCO (AmerenEnergy)

    Edwards facility does not have the necessary space available to install them.

    The States prepare SIPs in order to maintain the ambient air quality standards, pursuant to section 110 of the Clean Air Act (CAA).

    In its review of State SO2SIPs and SIP revision requests,

    EPA generally does not prescribe specific control measures, nor does it comment on the size of individual facilities. Rather, EPA requires that the emission limits be clear, enforceable, and protective of the

    National Ambient Air Quality Standards (NAAQS) for SO2. The level of

    Page 66557

    emissions allowed for new coal-fired plants in Illinois is not necessarily relevant to the emission limits of existing sources. Newer facilities may be expected to be more efficient or better suited for current control technology. Illinois may determine how best to manage its emission regulations, as long as the NAAQS continue to be maintained. In support of the 1999 variance, Illinois submitted air quality modeling results which evaluated the highest ground-level

    SO2concentrations possible with CILCO (AmerenEnergy)

    Edwards operating in compliance with the 1999 variance limits. This modeling, which included the SO2emissions from other nearby sources and a background SO2concentration value, showed that CILCO (AmerenEnergy) Edwards did not cause or contribute to a violation of the SO2NAAQS. EPA believes that the State has demonstrated that the CILCO (AmerenEnergy) Edwards rule revision will maintain the NAAQS.

    Comment: The public was led to believe that the variance approved in 2000 would be a temporary measure.

    Response: The 2000 action did in fact address a temporary measure.

    The Illinois Pollution Control Board (IPCB) anticipated that the company might ask for a permanent revision to its emission limits. The variance required CILCO (AmerenEnergy) Edwards to research and consider alternatives for complying with Phase II of the Acid Rain Program, report back to the IPCB, and if necessary, apply by February 28, 2002, for permanent SO2emission limit changes. The April 13, 2000, Federal Register made note of this provision at 65 FR 19839. It was not possible to inform the public of CILCO (AmerenEnergy) Edwards' intentions, since they were unknown to EPA at the time. CILCO

    (AmerenEnergy) Edwards might have reverted to its former limits, applied for the 1999 variance to be made permanent in 2002, or applied at any time for a different rule revision altogether.

    Comment: The timetable for review and available information is inadequate. The commenter requested additional time for review and also requested that EPA provide a public hearing to discuss the SIP revision prior to acting on it.

    Response: Upon receipt of the adverse comments, EPA withdrew the direct final action. The comment period was not extended. Thirty days is the usual comment period for a SIP action. The November 12, 2004, action was expected to be noncontroversial because it addressed a SIP revision which was identical to the SIP rule variance which EPA approved on April 13, 2000. There was a thirty day comment period for the April 13, 2000, action as well, and no comments were received at the time.

    In accordance with SIP procedures, the State of Illinois provided an opportunity for a public hearing on this proposed action prior to its adoption by the Illinois Pollution Control Board. The Notice of

    Hearing for this petition was filed on August 21, 2002, and the public hearing was held on October 11, 2002. Representatives from the Illinois

    Environmental Protection Agency and CILCO (AmerenEnergy) Edwards gave statements. No members of the public attended the hearing.

    Comment: EPA must complete the New Source Review investigation prior to approving this SIP revision. EPA should not approve a variance for a coal-fired power plant to skirt existing SO2limits for a facility that is under active investigation for a new source review violation.

    Response: Ongoing New Source Review investigations are not pertinent to the SIP approval process. It is not possible to anticipate the final outcome of these investigations. Any effect on allowable emissions or SIP rules will occur on a separate schedule. The courts did not place restrictions on the facilities under investigation that would have precluded SIP rulemaking actions; nor did the fact of such an investigation occurring within EPA place such restrictions. Since

    CILCO (AmerenEnergy) Edwards' proposed new limits were properly adopted by the State and were shown through air quality modeling to protect the

    SO2NAAQS, they are Federally approvable.

    Comment: The modeling fails to include new sources which have been built, permitted, or have applied for permits since 1999. The comment named Indeck-Elwood, Peabody's Prairie State Generating Station,

    Enviropower Franklin County Proposal, CornBelt Energy, the Dynegy

    Baldwin expansion, Franklin Power, the Marion IGCC proposal, a new coal plant in Springfield, Illinois, the Holcim Cement Plant in Missouri, and the proposed Peabody Thoroughbred power plant in Kentucky as other large SO2sources that were not included in the CILCO

    (AmerenEnergy) Edwards modeling.

    Response: Illinois' SIP emission inventory does not include sources which are not yet operating. Several of the commenter's named sources were not operating in 1998, when the CILCO (AmerenEnergy) Edwards modeling was completed, and some have not begun operating to date. As part of the Prevention of Significant Deterioration (PSD) permitting process, new sources address the maintenance of the NAAQS with dispersion modeling that includes neighboring sources. Such modeling would address the combined impact of the new source and existing nearby sources.

    Illinois' emission inventory for the CILCO (AmerenEnergy) Edwards rule included large SO2sources within 50 kilometers (km) of

    CILCO (AmerenEnergy) Edwards. The Industrial Source Complex Short Term model (ISCST3), EPA's recommended regulatory dispersion model in 1998, is not considered appropriate for use beyond a 50 km distance. All of the facilities named by the commenter are beyond 100 km from CILCO

    (AmerenEnergy) Edwards. A background SO2concentration, determined by actual monitored air quality data, was added to the modeled concentrations in a NAAQS analysis to represent the impacts of sources too distant to explicitly include in the modeling study.

    Comment: CILCO (AmerenEnergy) Edwards must conduct SO2 modeling that considers whether there are 24-hour or other

    SO2NAAQS violations, and whether there is any impact of

    CILCO (AmerenEnergy) Edwards on the Mingo National Wildlife Refuge or any other Class I area.

    Response: CILCO (AmerenEnergy) Edwards conducted air quality modeling to address the impacts of the variance in 1998. The 1998 modeling addressed all three averaging times for the SO2

    NAAQS (3 hour, 24 hour, and annual). No violations were found. The

    Mingo National Wildlife Refuge and the next nearest Class I area,

    Mammoth Cave National Park, are both over 300 km from CILCO

    (AmerenEnergy) Edwards. As stated before, the ISCST3 model is not considered appropriate for such distances. CILCO (AmerenEnergy)

    Edwards' SIP revision request was submitted in 2002, and at that time,

    EPA did not require Class I area analyses when the source was more than 100 km from a Class I area. Some current models can evaluate long-range transport beyond 100 km, but CILCO (AmerenEnergy) Edwards' distance from Class I areas and the emission change represented by the 1999 variance do not indicate a need for additional long-range transport modeling.

    Comment: EPA must consider CILCO (AmerenEnergy) Edwards' impact on

    PM2.5and 8-hour ozone NAAQS.

    Response: The SO2SIP revision for CILCO (AmerenEnergy)

    Edwards retains the facility's 34,613 lb/hr overall SO2 emissions cap and does not provide for an increase in PM2.5 precursor emissions. The SIP revision does not provide for increases in ozone precursors. The States are required to

    Page 66558

    submit attainment plans for areas designated nonattainment for particulate matter less than 2.5 microns in diameter (PM2.5) and ozone on an 8-hour average. These plans are being prepared separately under statutory schedules. Where appropriate, CILCO

    (AmerenEnergy) Edwards' emissions will be included in the analyses and control strategies. These ongoing actions do not affect the ability of

    CILCO (AmerenEnergy) Edwards to demonstrate that its SO2 limits address the NAAQS for SO2. If further revisions to

    CILCO (AmerenEnergy) Edwards' SO2limits are necessary as part of the PM2.5or ozone SIPs, Illinois must submit such revisions for Federal approval as they are developed.

    Comment: EPA has not complied with the Endangered Species Act

    (ESA). Federal agencies are required to review their actions ``to insure that any action authorized, funded, or carried out by such agency * * * is not likely to jeopardize the continued existence of any endangered species * * * .'' See Sec. 7(a)(2) of the Endangered Species

    Act.

    Response: EPA disagrees with the commenter. Under relevant CAA provisions, States are entitled to administer their own plans for the implementation, maintenance, and enforcement of the national primary and secondary ambient air quality standards. 42 U.S.C. 7410. EPA is required to approve a State's revision to its SIP that meets all applicable CAA requirements. 42 U.S.C. 7410(k)(3). Illinois' proposed

    SIP revision for CILCO (AmerenEnergy) Edwards satisfies the conditions of section 110(l) of the CAA, the applicable CAA requirement.

    Accordingly, and as confirmed by recent Supreme Court precedent, the

    ESA requirements cited in the comments do not apply to EPA's decision to approve Illinois' SIP revision for CILCO (AmerenEnergy) Edwards. See 50 CFR 402.03; National Ass'n of Home Builders v. Defenders of

    Wildlife, 127 S. Ct. 2518 (2007) (Defenders of Wildlife).

    Section 7(a)(2) of the ESA generally requires Federal agencies to consult with the relevant Federal wildlife agencies to ensure that actions they authorize, fund, or carry out are not likely to jeopardize the continued existence of Federally-listed endangered or threatened species, or result in the destruction or adverse modification of designated critical habitat of such species. 16 U.S.C. 1536(a)(2). In accordance with relevant ESA implementing regulations, this requirement applies only to actions in which there is discretionary Federal involvement or control. 50 CFR 402.03. In National Ass'n of Home

    Builders v. Defenders of Wildlife, 127 S. Ct. 2518 (2007) (Defenders of

    Wildlife), the Supreme Court examined these provisions in the context of EPA's decision to approve a State permitting program under the Clean

    Water Act (CWA). In that case, the Court held that when a Federal agency is required by statute to undertake a particular action once certain specified triggering events have occurred, there is no relevant agency discretion, and thus the requirements of ESA section 7(a)(2) do not apply. 127 S. Ct. at 2536.

    With regard to EPA's transfer of CWA permitting authority to a

    State, the Court found that the relevant CWA provision mandated that

    EPA ``shall approve'' a State permitting program if a list of CWA statutory criteria are met. Therefore, EPA lacked the discretion to deny a transfer application that satisfied those criteria. Id. at 2531- 32. The Court also found that the relevant CWA program approval criteria did not include consideration of endangered or threatened species, and stated that ``[n]othing in the text of [the relevant CWA provision] authorizes EPA to consider the protection of threatened or endangered species as an end in itself when evaluating [an] application'' to transfer a permitting program to a State. Id. at 2537.

    Accordingly, the Court held that the CWA required EPA to approve the

    State's permitting program if the statutory criteria were met; those criteria did not include the consideration of ESA-protected species; and thus, consistent with 50 CFR 402.03, the non-discretionary action to transfer CWA permitting authority to the State did not trigger relevant ESA section 7 requirements.

    Similar to the CWA program approval provision at issue in Defenders of Wildlife, section 110(k)(3) of the CAA mandates that EPA ``shall approve'' a SIP submittal that meets applicable CAA requirements. 42

    U.S.C. 7410(k)(3). With respect to SIP revisions such as Illinois' requested revision, section 110(l) of the CAA provides the relevant applicable CAA requirements and prohibits the Administrator from approving a SIP revision that ``would interfere with any applicable requirement concerning attainment and reasonable further progress * *

    *, or any other applicable requirement'' of the CAA. 42 U.S.C. 7410(l).

    As was the case with the CWA requirements in Defenders of Wildlife, the SIP requirements contained in section 110 of the CAA do not include protection of listed species, and section 110(l) of the CAA does not state that consideration of impacts on listed species is a factor to consider in approving SIP revisions. EPA's action on State SIP submittals is governed by section 110 of the CAA, which unequivocally directs EPA to approve State plans meeting applicable CAA requirements.

    EPA recognizes that it exercises some judgment when evaluating whether a SIP submittal meets specific statutory criteria. However, as the Supreme Court held in Defenders of Wildlife, the use of such judgment does not allow the Agency ``the discretion to add another entirely separate prerequisite''--such as the ESA section 7(a)(2) consultation requirements--to the list of required criteria EPA considers when determining whether it ``shall approve'' a SIP revision request. 127 S. Ct. at 2537.

    Applying the reasoning of Defenders of Wildlife, the SIP approval criteria contained in the CAA do not provide EPA with the discretionary authority to consider whether approval of SIP revisions may affect any listed species. EPA has determined that Illinois has submitted a SIP revision request for CILCO (AmerenEnergy) Edwards that satisfies all of the applicable SIP requirements contained in section 110 of the CAA.\1\

    Thus, given the Supreme Court precedent and applicable regulations--see 50 CFR 402.03--EPA is without discretion to disapprove or condition the

    State's SIP revision request based on considerations regarding listed species, and the ESA requirements cited by the commenter are thus inapplicable to this approval action.

    \1\ On the basis of modeling demonstrating a worst-case allowable emissions scenario under the requested revision, EPA has determined that the CILCO (AmerenEnergy) Edwards SIP revision will not interfere with any applicable requirement concerning attainment and reasonable further progress. Nor will it cause or contribute to exceedances of the National Ambient Air Quality Standards in other

    States. Therefore, the revision has met all applicable requirements under the CAA.

    Comment: Approving a permanent variance appears to be illegal backsliding under CAA section 110, because the proposed rule would relax the clean air safeguards contained in the existing SIP.

    Response: EPA disagrees. This SIP revision has been shown to maintain the SO2NAAQS under worst-case operating conditions. Therefore, it does not violate 110(l). Sections 110(l) and 110(n)(1) allow States to revise their SIPs and submit them to the EPA for review and approval.

  9. What Action Is EPA Taking?

    EPA is approving a July 29, 2003, site-specific request to revise

    Illinois' SO2

    Page 66559

    SIP for the Central Illinois Light Company E.D. Edwards Generating

    Station, now known as AmerenEnergy Resources Generating Company,

    Edwards Power Plant, in Bartonville, Peoria County, Illinois. The requested revision changes the SO2emission limits for the plant's three boilers.

  10. Statutory and Executive Order Reviews.

    Under the Clean Air Act, the Administrator is required to approve a

    SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a).

    Thus, in reviewing SIP submissions, EPA's role is to approve State choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves State law as meeting Federal requirements and does not impose additional requirements beyond those imposed by

    State law. For that reason, this action:

    Is not a ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993);

    Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);

    Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory

    Flexibility Act (5 U.S.C. 601 et seq.);

    Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded

    Mandates Reform Act of 1995 (Pub. L. 104-4);

    Does not have Federalism implications as specified in

    Executive Order 13132 (64 FR 43255, August 10, 1999);

    Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);

    Is not a significant regulatory action subject to

    Executive Order 13211 (66 FR 28355, May 22, 2001);

    Is not subject to requirements of section 12(d) of the

    National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and

    Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under

    Executive Order 12898 (59 FR 7629, February 16, 1994).

    In addition, this rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), because the SIP is not approved to apply in Indian country located in the State, and EPA notes that it will not impose substantial direct costs on tribal governments or preempt tribal law.

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the

    Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the

    United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of

    Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal

    Register. This action is not a ``major rule'' as defined by 5 U.S.C. 804(2).

    Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by January 9, 2009. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

    List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Reporting and recordkeeping requirements, Sulfur oxides.

    Dated: October 2, 2008.

    Lynn Buhl,

    Regional Administrator, Region 5. 0

    For the reasons stated in the preamble, part 52, chapter I, of title 40 of the Code of Federal Regulations is amended as follows:

    PART 52--[AMENDED] 0 1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

    Subpart O--Illinois 0 2. Section 52.720 is amended by adding paragraph (c)(171) to read as follows:

    Sec. 52.720 Identification of plan.

    * * * * *

    (c) * * *

    (171) On July 29, 2003, the Illinois Environmental Protection

    Agency submitted a site-specific revision to the State Implementation

    Plan (SIP) for sulfur dioxide (SO2) for the Central Illinois

    Light Company's E.D. Edwards Generating Station, now known as

    AmerenEnergy Resources Generating Company, Edwards Power Plant, in

    Bartonville, Peoria County, Illinois.

    (i) Incorporation by reference.

    Illinois Administrative Code Title 35: Environmental Protection,

    Subtitle B: Air Pollution, Chapter 1: Pollution Control Board,

    Subchapter c: Emissions Standards and Limitations for Stationary

    Sources, Part 214: Sulfur Limitations, Subpart X: Utilities Section 214.561 E.D. Edwards Electric Generating Station which was amended at 27 Illinois Register 12101, effective July 11, 2003.

    FR Doc. E8-26492 Filed 11-7-08; 8:45 am