Environmental Impact Statements; Availability, etc.: Stream Protection Rule

Federal Register: June 18, 2010 (Volume 75, Number 117)

Proposed Rules

Page 34666-34669

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr18jn10-21

DEPARTMENT OF THE INTERIOR

Office of Surface Mining Reclamation and Enforcement 30 CFR Chapter VII

RIN 1029-AC63

Stream Protection Rule; Environmental Impact Statement

AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior.

ACTION: Proposed rule; notice of intent to prepare an environmental impact statement.

Page 34667

SUMMARY: On April 30, 2010,\1\ we, the Office of Surface Mining

Reclamation and Enforcement (OSM), published a Notice of Intent to prepare an environmental impact statement. This new Notice of Intent supersedes the April Notice of Intent, expands the scoping opportunities to include open houses, and outlines possible alternatives to the proposed action. OSM intends to prepare an environmental impact statement (EIS) under section 102(2)(C) of the

National Environmental Policy Act of 1969 (NEPA) to analyze the effects of potential rule revisions under the Surface Mining Control and

Reclamation Act of 1977 (SMCRA or the Act) to improve protection of streams from the adverse impacts of surface coal mining operations. We are requesting comments for the purpose of determining the scope of the

EIS.

\1\ 75 FR 22723 (April 30, 2010).

DATES: To ensure consideration, we must receive your electronic or

written comments by July 30, 2010.

ADDRESSES: You may submit comments by any of the following methods, although we request that you use electronic mail if possible:

Electronic mail: Send your comments to sra-eis@osmre.gov.

Mail, hand-delivery, or courier: Send your comments to

Office of Surface Mining Reclamation and Enforcement, Administrative

Record, Room 252-SIB, 1951 Constitution Avenue, NW., Washington, DC 20240.

Open Houses: Written and oral comments will be accepted at the Open House sessions, which are discussed in Section V of this

Notice.

FOR FURTHER INFORMATION CONTACT: John Craynon, Chief, Division of

Regulatory Support, Office of Surface Mining Reclamation and

Enforcement, 1951 Constitution Ave., NW., MS 202-SIB, Washington, DC 20240; Telephone 202-208-2866.

SUPPLEMENTARY INFORMATION:

Table of Contents

  1. Why are we publishing a new Notice of Intent?

  2. Why are we planning to revise our rules?

  3. What is the proposed Federal action?

  4. What are the possible alternatives?

  5. How do I submit comments?

  6. How do I request to participate as a cooperating agency?

  7. Why are we publishing a new Notice of Intent?

    On April 30, 2010, we published a Notice of Intent to prepare an environmental impact statement for a proposed Stream Protection Rule.

    We have decided to expand the scoping opportunities to include several open houses in various coal producing areas of the U.S. We have also included possible alternatives under consideration for each element of the proposed action. Finally, we have extended the scoping period to

    July 30, 2010.

  8. Why are we planning to revise our rules?

    On December 12, 2008 (73 FR 75814-75885), we published a final rule modifying the circumstances under which mining activities may be conducted in or near perennial or intermittent streams. That rule, which this notice refers to as the 2008 rule, took effect January 12, 2009. A total of nine organizations challenged the validity of the rule in two complaints filed on December 22, 2008, and January 16, 2009

    (amended complaint filed February 17, 2009): Coal River Mountain Watch, et al. v. Salazar, No. 08-2212 (D.DC) (``Coal River'') and National

    Parks Conservation Ass'n v. Salazar, No. 09-115 (D.DC) (``NPCA'').

    Under the terms of a settlement agreement signed by the parties on

    March 19, 2010, we agreed to use best efforts to sign a proposed rule by February 28, 2011, and a final rule by June 29, 2012. We also agreed to consult with the Fish and Wildlife Service pursuant to the

    Endangered Species Act, as appropriate, prior to signing the final action. On April 2, 2010, the court granted the parties' motion to hold the judicial proceedings in abeyance.

    However, we had already decided to change the rule following the change of Administrations on January 20, 2009. On June 11, 2009, the

    Secretary of the Department of the Interior, the Administrator of the

    U.S. Environmental Protection Agency (EPA), and the Acting Assistant

    Secretary of the Army (Civil Works) entered into a memorandum of understanding \2\ (MOU) implementing an interagency action plan designed to significantly reduce the harmful environmental consequences of surface coal mining operations in six Appalachian states, while ensuring that future mining remains consistent with Federal law. Among other things, under the MOU we committed to consider revisions to key provisions of our rules, including the 2008 rule and approximate original contour requirements, to better protect the environment and public health from the impacts of Appalachian surface coal mining.

    \2\ The MOU can be viewed online at http://www.osmre.gov/ resources/ref/mou/ASCM061109.pdf.

    Consequently, on November 30, 2009, we published an advance notice of proposed rulemaking (ANPR) soliciting comments on ten potential rulemaking alternatives. See 74 FR 62664-62668. In addition, consistent with the MOU, we invited the public to identify other rules that we should revise. We also announced our intent to prepare a supplement to the EIS developed in connection with the 2008 rule.

    We received approximately 32,750 comments during the 30-day comment period that closed December 30, 2009. After evaluating the comments, we determined that development of a comprehensive stream protection rule

    (one that is much broader in scope than the 2008 rule) would be the most appropriate and effective method of achieving the goals set forth in the MOU and the ANPR. We believe that this holistic approach will better protect streams and related environmental values. It would not be fair, appropriate, scientifically valid or consistent with the principles of SMCRA to apply the new protections only in central

    Appalachia, as some commenters on the ANPR advocated. Streams are ecologically significant regardless of the region in which they are located. The broader scope of the stream protection rule means that we will need to prepare a new environmental impact statement rather than the supplement to the 2008 EIS that we originally intended to prepare.

  9. What is the proposed Federal action?

    The proposed Federal action consists of revisions to various provisions of our rules to improve protection of streams from the impacts of surface coal mining operations nationwide. Principal elements of the proposed action include--

    Collection of Baseline Data. Adding more extensive and more specific permit application requirements concerning baseline data on hydrology, geology, and aquatic biology; the determination of the probable hydrologic consequences of mining; and the hydrologic reclamation plan; as well as more specific requirements for the cumulative hydrologic impact assessment.

    Definition of Material Damage to Hydrologic Balance.

    Defining the term ``material damage to the hydrologic balance outside the permit area.'' This term is critically important because, under section 510(b)(3) of SMCRA, the regulatory authority may not approve a permit application unless the proposed

    Page 34668

    operation has been designed to prevent material damage to the hydrologic balance outside the permit area. This term includes streams downstream of the mining operation and above underground mines.

    Mining Activities In or Near Streams. Revising the regulations governing mining activities in or near streams, including mining through streams.

    Additional Monitoring Requirements. Adding more extensive and more specific monitoring requirements for surface water, groundwater, and aquatic biota during mining and reclamation.

    Corrective Action Thresholds. Establishing corrective action thresholds.

    Land Forming and Fill Optimization. Revising the backfilling and grading rules, excess spoil rules, and approximate original contour restoration requirements to incorporate landform restoration principles and reduce discharges of total dissolved solids.

    Approximate Original Contour Exceptions. Limiting variances and exceptions from approximate original contour restoration requirements.

    Reforestation. Requiring reforestation of previously wooded areas.

    Permit Coordination. Requiring that the regulatory authority coordinate the SMCRA permitting process with Clean Water Act permitting activities to the extent practicable.

    Financial Assurances for Long-Term Discharges of

    Pollutants. Codifying the financial assurance provisions of OSM's March 31, 1997, policy statement \3\ on correcting, preventing, and controlling acid/toxic mine drainage and clarifying that those provisions apply to all long-term discharges of pollutants, not just pollutants for which effluent limitations exist.

    \3\ See the document entitled ``Acid Mine Drainage Policy'' at http://www.osmre.gov/guidance/significant_guidance.shtm.

    Stream Definitions. Updating the definitions of perennial, intermittent, and ephemeral streams.

  10. What are the possible alternatives?

    We are in the process of developing alternatives for the proposed

    Federal action. Comments received in response to this notice will assist us in that process.

    We will prepare a draft EIS after we complete the initial stages of scoping and identify which rulemaking alternatives will be analyzed in detail. Following release of the draft EIS, we anticipate publishing a notice of proposed rulemaking.

    Listed below are some of the possible alternatives, in addition to the No Action Alternative, that we are considering for each element of the proposed action:

    Additional Requirements for Collection of Baseline Data.

    Add requirements that permit applicants provide more specific and comprehensive baseline data addressing factors such as: (1) Duration of sampling needed to demonstrate seasonal variations in hydrology, e.g., 12 months, 24 months, or other duration; (2) Frequency of sampling for various types of baseline data, e.g., monthly, quarterly, annually; (3)

    Location of sampling, e.g., downstream, upstream, off-permit; (4)

    Aquatic biological communities subject to sampling; and (5) Chemical, physical, and hydrologic parameters to be sampled.

    Definition of Material Damage to Hydrologic Balance.

    Alternatives for defining the term ``material damage'' include: (1) Any impairment of a physical, chemical, or biological function of the hydrologic balance; (2) Any quantifiable adverse impact on the quality or quantity of surface or groundwater or the biological condition of a stream that would preclude or diminish use of the water or stream; (3)

    Any ongoing violation of water quality standards; and (4)

    Differentiating between short term vs. long term impairment.

    Mining Activities In or Near Streams. Alternatives for regulating mining activities in, through, or near streams include: (1)

    Prohibiting disturbance of streams with a biological community unless the permit applicant demonstrates the ability to restore stream form and function; (2) Prohibiting activities and disturbances in all streams with a biological community, irrespective of the ability of the permit applicant to restore form and function; (3) Prohibiting activities in or near streams; (4) Reinstating the 1983 stream buffer zone rule; and (5) Addressing whether fills should be included or excluded in these restrictions.

    Additional Monitoring Requirements. Permittees would be required to provide additional monitoring data based on the following considerations: (1) Duration of monitoring, e.g., through final bond release; (2) Frequency of sampling, e.g., continuous, weekly, monthly, quarterly, annually; (3) Location of sampling, e.g., downstream, upstream, off-permit; (4) Biological components subject to sampling;

    (5) Sampling parameters, e.g., chemical, physical, hydrologic; and (6)

    Regular review of monitoring data by regulatory authority, e.g., annually, at mid-term review, at permit renewal.

    Corrective Action Thresholds. Alternatives for determining the circumstances under which the permittee must take corrective action to prevent material damage to the hydrologic balance include: (1)

    Developing numerical water quality thresholds based on biological criteria; (2) Developing action thresholds based on water quality trend analysis; and (3) Defining key parameters for which thresholds will be established.

    Landforming and Fill Optimization. Alternatives for evaluating land configuration and handling of excess spoils include:

    (1) Restoring landforms including slope, aspect, and elevation on both backfilled areas and excess spoil fills; (2) Allowing postmining elevations to exceed premining elevations when necessary to restore premining topographic features; (3) Revising requirements to minimize creation of excess spoil by maximizing the amount of spoil returned to the mined-out area; (4) Revising requirements to minimize excess spoil footprints; and (5) Banning excess fill placement in streams.

    Approximate Original Contour Exceptions. Alternatives under consideration include: (1) Modifying requirements to ensure that exceptions from approximate original contour restoration requirements do not result in additional damage to streams with a biological community; (2) Prohibiting ``mountain top'' mining (would require a statutory change); and (3) Adding requirements to ensure approved postmining land uses are achievable and feasible.

    Reforestation. Alternatives under consideration include:

    (1) Requiring reforestation of mined lands to premining diversity and stocking or some percentage of premining diversity and stocking; (2)

    Requiring reforestation of all mined lands capable of supporting forested land uses; (3) Requiring reforestation of mined lands to the extent compatible with postmining land use; (4) Requiring reforestation and revegetation of mined lands with native species; and (5) Minimizing forest fragmentation.

    Permit Coordination. A provision under consideration includes: (1) Enhancing coordination of SMCRA and Clean Water Act regulatory programs consistent with the 2009 Memorandum of

    Understanding among DOI, Army Corps of Engineers, and EPA; and (2)

    Standardizing data collection and

    Page 34669

    management to enhance sharing among regulatory agencies and the public.

    Long-Term Discharges of Pollutants. A provision under consideration includes: (1) Incorporating our March 31, 1997 policy statement (see footnote 3 above) into SMCRA regulations and clarifying that those provisions apply to all long-term discharges of pollutants.

    Stream Definitions. Alternatives under consideration include: (1) Updating the current definitions of perennial, intermittent, and ephemeral streams to include biological criteria; (2)

    Retaining the current definitions with the 1-square mile criterion for intermittent streams removed; (3) Adopting the stream definitions used by the Corps of Engineers--``waters of the United States''-- in place of stream definitions; and (4) Using a flow-based (hydraulic) definition with no reference to biological condition.

  11. How do I submit comments?

    Consistent with 43 CFR 46.235, we invite all interested persons, organizations, and agencies to provide comments, suggestions, and any other information relevant to the scope of the EIS, the scope of the proposed Federal action, potential alternatives for the proposed

    Federal action, and studies and impacts that the EIS should address.

    See ADDRESSES for the methods by which we will accept comments.

    We also anticipate conducting several open houses in various locations in coal producing regions of the U.S. in July 2010. The following locations are under consideration: Morgantown, WV; Beckley,

    WV; Hazard, KY; Birmingham, AL; Evansville, IN; Carbondale, IL;

    Fairfield, TX; Farmington, NM; and Gillette, WY. The open houses will provide an opportunity for the public to review information and provide oral and written comments regarding the scope of the issues to be addressed and identification of the significant issues related to the proposed action and possible alternatives. Information regarding the specific dates and locations will be posted on OSM's Web site, http:// www.osmre.gov, and in local news media.

    Before including your address, phone number, e-mail address, or other personal identifying information in your comment, you should be aware that your entire comment, including your personal identifying information, may be made publicly available at any time. While you can ask us in your comment to withhold your personal identifying information from public review, we cannot guarantee that we will be able to do so. Comments that we receive after the close of the comment period (see DATES) or sent to an address other than those listed in

    ADDRESSES may not be considered.

    If you previously submitted comments in response to the ANPR or the

    April 30, 2010 Notice of Intent, you do not need to resubmit them. We will consider all ANPR and April 30th comments as part of this EIS scoping process.

  12. How do I request to participate as a cooperating agency?

    Consistent with 43 CFR 46.225, we, the lead agency, invite eligible

    Federal, state, tribal, and local governmental entities to indicate whether they have an interest in being a cooperating agency in the preparation of the EIS. Qualified entities are those with jurisdiction by law, as defined in 40 CFR 1508.15, or special expertise, as defined in 40 CFR 1508.26. Potential cooperating agencies should consider their authority and capacity to assume the responsibilities of a cooperating agency and make the necessary resources available in a timely manner, as discussed in the document entitled ``Factors for Determining

    Cooperating Agency Status,''\4\ which is Attachment 1 to the Council on

    Environmental Quality's January 30, 2002, Memorandum for the Heads of

    Federal Agencies: Cooperating Agencies in Implementing the Procedural

    Requirements of the National Environmental Policy Act. We will not be able to provide financial assistance to cooperating agencies. If you previously indicated that you were interested in being a cooperating agency, no further action is required.

    \4\ See http://ceq.hss.doe.gov/nepa/regs/cooperating/ cooperatingagencymemofactors.html.

    If you have an interest in participating as a cooperating agency, please contact the person listed in FOR FURTHER INFORMATION CONTACT and identify those aspects of the EIS process in which you are interested in participating. The regulations at 43 CFR 46.230 and Items 4 through 6 in the document discussed in the preceding paragraph list the activities in which cooperating agencies may wish to participate.

    Dated: June 10, 2010.

    Sterling Rideout,

    Assistant Director, Program Support.

    FR Doc. 2010-14727 Filed 6-17-10; 8:45 am