Environmental Impact Statements; Availability, etc.: Weekly Receipt

Federal Register: June 25, 2010 (Volume 75, Number 122)

Notices

Page 36386-36387

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr25jn10-54

ENVIRONMENTAL PROTECTION AGENCY

ER-FRL-8991-1

Environmental Impacts Statements; Notice of Availability

Responsible Agency: Office of Federal Activities, General

Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements filed 06/14/2010 through 06/18/2010 pursuant to 40 CFR 1506.9.

Notice: In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA's comment letters, in the Federal Register. Since

February 2008, EPA has been including its comment letters on EISs on its Web site at: http://www.epa.gov/compliance/nepa/eisdata.html.

Including the entire EIS comment letters on the Web site satisfies the

Section 309(a) requirement to make EPA's comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the

Federal Register.

EIS No. 20100225, Draft EIS, BLM, NV, Winnemucca District Office

Resource Management Plan, Implementation, Black Rock Desert-High Rock

Canyon Emigrant Trails National Conservation Area, Humboldt, Pershing,

Washoe, Lyon and Churchill Counties, NV, Comment Period Ends: 09/22/ 2010, Contact: Robert Edward, 775-623-1597.

EIS No. 20100226, Final EIS, USFS, CA, Big Grizzly Fuels Reduction and

Forest Health Project, Proposes Vegetation Treatments, Eldorado

National Forest, Georgetown Ranger District, Georgetown, CA, Wait

Period Ends: 07/26/2010, Contact: Dana Walsh, 530-333-5558.

EIS No. 20100227, Final EIS, NOAA, 00, Rationalization of the Pacific

Coast Groundfish Limited Entry Trawl Fishery, Amendment 20,

Implementation, WA, OR and CA, Wait Period Ends: 07/26/2010, Contact:

Barry A. Thom, 206-526-6150.

EIS No. 20100228, Final EIS, FHWA, WI, WI-23 Highway Project,

Transportation Improve between Fond du Lac and Plymouth, Fond du Lac and Sheboygan Counties, WI, Wait Period Ends: 07/26/2010, Contact:

George Poirier, 608-829-7500.

EIS No. 20100229, Draft EIS, NRC, NC, GE-Hitachi Global Laser

Enrichment LLC Facility, Construct, Operate, and Decommission a Laser-

Based Uranium Enrichment Facility, Wilmington, NC, Comment Period Ends: 08/09/2010, Contact: Jennifer Davis, 301-415-3835.

EIS No. 20100230, Final EIS, FTA, HI, Honolulu High-Capacity Transit

Corridor Project, Provide High-Capacity Transit Service on O'ahu from

Kapolei to the University of Hawaii at Manoa and Waikiki, City and

County of Honolulu, O'ahu, Hawaii, Wait Period Ends: 07/26/2010,

Contact: Ted Matley, 415-744-3133.

EIS No. 20100231, Third Draft Supplement, USACE, FL, Herbert Hoover

Dike Major Rehabilitation Evaluation Study, Proposed to Reconstruct and

Rehabilitate Reach 1A Landside Rehabilitation, Lake Okeechobee, Martin and Palm Beach Counties, FL, Comment Period Ends: 08/09/2010, Contact:

Angela Dunn, 904-232-2108.

EIS No. 20100232, Final EIS, NOAA, 00, Amendment 21 to the Pacific

Coast Groundfish Fishery Management Plan, (FMP), Allocation of Harvest

Opportunity between Sectors, Implementation, WA, OR and CA, Wait Period

Ends: 07/26/2010, Contact: Barry A. Thom, 206-526-6150.

EIS No. 20100233, Revised Draft EIS, USFS, 00, Uinta National Forest

Oil and Gas Leasing, Implementation, Identify National Forest Systems

Lands with Federal Mineral Rights, Wasatch, Utah, Juab, Tooele, and

Sanpete Counties, UT, Comment Period Ends: 08/09/2010, Contact: Kim

Martin, 801-342-5100.

EIS No. 20100234, Final EIS, USAF, 00, Shaw Air Base Airspace Training

Initiative (ATI), 20th Fighter Wing Proposal to Modify the Training

Airspace Overlying Parts, South Carolina and Georgia, Wait Period Ends: 07/26/2010, Contact: Linda Devine, 757-964-9434.

EIS No. 20100235, Final EIS, FSA, 00, PROGRAMMATIC--Biomass Crop

Assistance Program (BCAP), To Establish and Administer the Program

Areas Program Component of BCAP as mandated in Title IX of the 2008

Farm Bill in the United States, Wait Period Ends: 07/26/2010, Contact:

Matthew T. Ponish, 202-720-6853.

Page 36387

Amended Notices

EIS No. 20040214, Draft EIS, FHWA, CA, WITHDRAWN--Gold Line Phase

II--Pasadena to Montclair--Foothill Extension, Address Transportation

Problems and Deficiencies, Cities of Pasadena, Arcadia, Monrovia,

Durate, Irwindale, Azusa, Glendora, San Dimas, La Verne, Pomona and

Claremont in Los Angeles County, and Cities of Montclair and Upland in

San Bernardino County, CA, Comment Period Ends: 06/21/2004, Contact:

Erv Poka, 213-202-3950. Revision to FR Notice Published 05/07/2004: The

EIS was Officially Withdraw by filing Agency in Letter Dated 06/17/ 2010.

Dated: June 22, 2010.

Robert W. Hargrove,

Director, NEPA Compliance Division, Office of Federal Activities.

FR Doc. 2010-15502 Filed 6-24-10; 8:45 am

BILLING CODE 6560-50-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT