Environmental Impact Statements; Availability, etc. Weekly Receipt
Federal Register: June 26, 2009 (Volume 74, Number 122)
Notices
Page 30569-30571
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
DOCID:fr26jn09-68
ENVIRONMENTAL PROTECTION AGENCY
ER-FRL-8594-7
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/
Page 30570
Weekly receipt of Environmental Impact Statements filed 06/15/2009 through 06/19/2009 pursuant to 40 CFR 1506.9.
EIS No. 20090196, Draft EIS, SFW, MT, Montana Department of Natural and
Resources and Conservation Plan (HCP), Forested State Trust Lands,
Designed to Minimize and Mitigate Any Such Take of Endangered or
Threatened Species, Application for an Incidental Take Permit, MT,
Comment Period Ends: 09/23/2009, Contact: Amelia Orton-Palmer 303-236- 4211.
EIS No. 20090197, Final EIS, WAP, MN, Big Stone II Power Plant and
Transmission Project, Addresses the Impacts of Changes to the Proposed
Action Relative to Cooling Alternatives and the Use of Groundwater as
Backup Water Source, US Army COE Section 10 and 404 Permits, Grant
County, SD and Big Stone County, MN, Wait Period Ends: 07/27/2009,
Contact: Matt Blevins 720-962-7261.
EIS No. 20090198, Draft EIS, AFS, CA, Shasta-Trinity National Forest
Motorized Travel Management Project, Proposal to Prohibit Cross-County
Motor Vehicle Travel off Designated National Forest Transportation
System (NFTS) Roads, Motorized Trails and Areas by the Public Except as
Allowed by Permit or Other Authorization (excluding snowmobile use),
CA, Comment Period Ends: 08/10/2009, Contact: Robert Remillard 530-226- 2421.
EIS No. 20090199, Draft EIS, AFS, OR, Westside Rangeland Analysis
Project, Proposal to Allocate Forage for Commercial Livestock Grazing on Six Alternatives, Mud and Tope Creeks, Wallowa Valley Ranger
District, Wallowa-Whitman National Forest, Wallowa County, OR, Comment
Period Ends: 08/10/2009, Contact: Alicia Glassford 541-426-5689.
EIS No. 20090200, Draft EIS, AFS, MI, Niagara Project, To Address Site-
Specific Vegetation and Transportation System Needs in the Project
Areas, Hiawatha National Forest, St. Ignace and Sault Ste. Marie Ranger
Districts, Mackinac and Chippewa Counties, MI, Comment Period Ends: 08/ 10/2009, Contact: Martha Sjogren 906-643-7900 Ext. 117.
EIS No. 20090201, Final Supplement, AFS, CA, Brown Project, Revised
Proposal To Improve Forest Health by Reducing Overcrowded Forest Stand
Conditions, Trinity River Management Unit, Shasta-Trinity National
Forest, Weaverville Ranger District, Trinity County, CA, Wait Period
Ends: 07/27/2009, Contact: Robert Remillard 530-226-2421.
EIS No. 20090202, Final EIS, AFS, MT, Ashland Ranger District Travel
Management Project, Proposing to Designate Routes for Public Motorized
Use, Ashland Ranger District, Custer National Forest, Rosebud and Power
River Counties, MT, Wait Period Ends: 07/27/2009, Contact: Doug Epperly 406-657-6202 Ext. 225.
EIS No. 20090203, Final EIS, NOA, 00, Snapper Grouper Amendment 15B,
Fishery Management Plan, Updated Information on the Economic Analysis for the Bag Limit Sales Provision, Update Management Reference Point for Golden Tilefish (Lopholatilus chamaeleonticeps); Define Allocations for Snowy Grouper (Epinephelus niveatus) and Red Porgy (Pagrus pagrus),
NC, SC, FL and GA, Wait Period Ends: 07/27/2009, Contact: Dr. Roy E.
Crabtree 727-824-5305.
EIS No. 20090204, Final EIS, AFS, 00, Sioux Ranger District Travel
Management Project, To Designate the Road and Trail and Areas Suitable for Public Motorized Travel, Sioux Ranger District, Custer National
Forest, Carter County of MT and Harding County of South Dakota, Wait
Period Ends: 07/27/2009, Contact: Doug Epperly 406-657-6205 Ext 225.
EIS No. 20090205, Draft Supplement, AFS, OR, Invasive Plant Treatments
Within the Deschutes and Ochoco National Forests and the Crooked River
National Grassland, Updated Information on Three New Alternatives,
Proposal for Treatment of Invasive Plant Infestation and Protection of
Uninfested Areas, Implementation, Several Cos., OR, Comment Period
Ends: 08/10/2009, Contact: Beth Peer 541-383-4769.
EIS No. 20090206, Final EIS, NOA, 00, PROGRAMMATIC EIS--Fishery
Management Plan for Regulating Offshore Marine Aquaculture in the Gulf of Mexico, To Increase the Maximum Sustainable Yield (MSY) and Optimun
Yield (OY), Implementation, Wait Period Ends: 07/27/2009, Contact: Dr.
Roy E. Crabtree 727-551-5755.
EIS No. 20090207, Final EIS, FHW, UT, SR-262; Montezuma Creek to Aneth
Project, Improvements to the Intersection of SR-162, SR-262, and County
Road (CR) 450 in Montezuma Cree, Funding, Navajo Nation, San Juan
County, UT, Wait Period Ends: 07/27/2009, Contact: Ed Woolford 801-963- 0182.
EIS No. 20090208, Draft EIS, FHW, IL, Illinois 336 Corridor Project,
(Federal Aid Primary Route 315), Proposed Macomb Bypass in McDonough
County, to I-474 west of Peoria in Peoria County, Funding, McDonough,
Fulton and Peoria Counties, IL, Comment Period Ends: 08/24/2009,
Contact: Norman Stoner, P.E. 217-492-4600.
EIS No. 20090209, Draft EIS, BLM, WY, Wright Area Coal Lease Project,
Applications for Leasing Six Tracts of Federal Coal Reserves Adjacent to the Black Thunder, Jacob Ranch, and North Antelope Rochelle Mines,
Wyoming Powder River Basin, Campbell County, WY, Comment Period Ends: 08/24/2009, Contact: Sarah Bucklin 307-261-7541.
EIS No. 20090210, Draft EIS, FRC, 00, Ruby Pipeline Project, Proposed
Natural Gas Pipeline Facilities, Right-of-Way Grants (and/or Temporary
Use or Special Use Permits), WY, UT, NV and OR, Comment Period Ends: 08/10/2009, Contact: Patricia Schaub 1-866-208-3372.
EIS No. 20090211, Draft Supplement, AFS, CO, Vail Ski Area's 2007
Improvement Project, Proposed On-Mountain Restaurant from the top of
Vail Mountain to Mid Vail, Special-Use-Permit, Eagle/Holy Cross Ranger
District, White River National Forest, Eagle County, CO, Comment Period
Ends: 08/10/2009, Contact: Don Dressler 970-827-5157.
EIS No. 20090212, Final EIS, FTA, MN, Central Corridor Project,
Selected the Preferred Alternative, 11 miles Light Rail Transit between downtown Minneapolis and downtown St. Paul, Minnesota, Twin Cities
Metropolitan Area, MN, Wait Period Ends: 07/27/2009, Contact: William
Wheeler 312-353-2639.
EIS No. 20090213, Final EIS, USN, 00, Undersea Warfare Training Range
Project, Installation and Operation, Preferred Site Jacksonville
Operating Area, FL and Alternative Sites (within the Charleston, SC;
Cherry Point, NC; and VACAPES Operating Areas, VA, Wait Period Ends: 07/27/2009, Contact: Lesley Leonard 757-322-4645.
EIS No. 20090214, Final EIS, CGD, 00, PROGRAMMATIC--Vessel and Facility
Response Plans for Oil: 2003 Removal Equipment Requirements and
Alternative Technology Revisions, To Increase the Oil Removal
Capability, U.S. Exclusive Economic Zone (EEZ), United States, Alaska,
Guam, Puerto Rico and other U.S. Territories, Wait Period Ends: 07/27/ 2009, Contact: Greg Kirkbride 202-372-1479.
Page 30571
Dated: June 23, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
FR Doc. E9-15141 Filed 6-25-09; 8:45 am
BILLING CODE 6560-50-P