Delegation of Authority to the States of Iowa; Kansas; Missouri; Nebraska; Lincoln-Lancaster County, NE; and City of Omaha, NE., for New Source Performance Standards (NSPS), National Emission Standards for Hazardous Air Pollutants (NESHAP) Including Maximum Achievable Control Technology (MACT) Standards

Federal Register, Volume 78 Issue 230 (Friday, November 29, 2013)

Federal Register Volume 78, Number 230 (Friday, November 29, 2013)

Rules and Regulations

Pages 71510-71523

From the Federal Register Online via the Government Printing Office www.gpo.gov

FR Doc No: 2013-28243

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Parts 60, 61, and 63

EPA-R07-OAR-2013-0512; FRL 9903-15-Region 7

Delegation of Authority to the States of Iowa; Kansas; Missouri; Nebraska; Lincoln-Lancaster County, NE; and City of Omaha, NE., for New Source Performance Standards (NSPS), National Emission Standards for Hazardous Air Pollutants (NESHAP) Including Maximum Achievable Control Technology (MACT) Standards

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of delegation of authority.

-----------------------------------------------------------------------

SUMMARY: The States of Iowa, Kansas, Missouri, and Nebraska and the local agencies of Lincoln-Lancaster County, Nebraska, and the city of Omaha, Nebraska, have submitted updated regulations for delegation of EPA authority for implementation and enforcement of NSPS, NESHAP, and MACT standards. The submissions cover new EPA standards and, in some instances, revisions to standards previously delegated. EPA's review of the pertinent regulations shows that they contain adequate and effective procedures for the implementation and enforcement of these Federal standards. This action informs the public of delegations to the above-mentioned agencies.

DATES: This document is effective on November 29, 2013. The dates of delegation can be found in the SUPPLEMENTARY INFORMATION section of this document.

ADDRESSES: Copies of documents relative to this action are available for public inspection during normal business hours at the Environmental Protection Agency, Air Planning and Development Branch, 11201 Renner Road, Lenexa, Kansas 66219. The interested persons wanting to examine these documents should make an appointment with the office at least 24 hours in advance.

Effective immediately, all notifications, applications, reports, and other correspondence required pursuant to the newly delegated standards and revisions identified in this document must be submitted with respect to sources located in the jurisdictions identified in this document, to the following addresses:

Iowa Department of Natural Resources, Air Quality Bureau, 7900 Hickman Road, Suite 1, Windsor Heights, Iowa 50324.

Kansas Department of Health and the Environment, Bureau of Air, 1000 SW Jackson Street, Suite 310, Topeka, Kansas 66612-1367.

Missouri Department of Natural Resources, Air Pollution Control Program, PO Box 176, Jefferson City, Missouri 65102-0176.

Nebraska Department of Environmental Quality, Air Quality Division, 1200 ``N'' Street, Suite 400, P.O. Box 98922, Lincoln, Nebraska 68509.

Lincoln-Lancaster County Health Department, Division of Environmental Public Health, Air Quality Section, 3140 ``N'' Street, Lincoln, Nebraska 68510.

City of Omaha, Public Works Department, Air Quality Control Division, 5600 South 10th Street, Omaha, Nebraska 68107.

Duplicates of required documents must also continue to be submitted to the EPA Regional Office at the above address.

FOR FURTHER INFORMATION CONTACT: Ms. Paula Higbee at (913) 551-7028, or by email at higbee.paula@epa.gov.

SUPPLEMENTARY INFORMATION: The supplementary information is organized in the following order:

  1. What does this action do?

  2. What is the authority for delegation?

  3. What does delegation accomplish?

  4. What has been delegated?

  5. What has not been delegated?

    List of Delegation Tables

    Table I--NSPS, 40 CFR part 60

    Table II--NESHAP, 40 CFR part 61

    Table III--NESHAP, 40 CFR part 63

  6. What does this action do?

    EPA is providing notice of an update to its delegable authority for implementation and enforcement of the Federal standards shown in the tables below to the states of Iowa, Kansas, Missouri, and Nebraska. This action updates the delegation tables previously published at 76 FR 10761 (February 28, 2011). EPA has established procedures by which these agencies are automatically delegated the authority to implement the standards when they adopt regulations which are identical to the Federal standards. We then periodically provide notice of the new and revised standards for which delegation has been given. This notice does not affect or alter the status of the listed standards under state or Federal law.

  7. What is the Authority for Delegation?

    1. Section 111(c)(1) of the Clean Air Act (CAA) authorizes EPA to delegate

    Page 71511

    authority to any state agency which submits adequate regulatory procedures for implementation and enforcement of the NSPS program. The NSPS are codified at 40 CFR part 60.

    2. Section 112(l) of the CAA and 40 CFR part 63, subpart E, authorizes EPA to delegate authority to any state or local agency which submits adequate regulatory procedures for implementation and enforcement of emission standards for hazardous air pollutants. The hazardous air pollutant standards are codified at 40 CFR parts 61 and 63, respectively.

  8. What does delegation accomplish?

    Delegation confers primary responsibility for implementation and enforcement of the listed standards to the respective state and local air agencies. However, EPA also retains the concurrent authority to enforce the standards.

  9. What has been delegated?

    Tables I, II, and III below list the delegated standards. Each item listed in the Subpart column has two relevant dates listed in each column for each state. The first date in each block is the reference date to the CFR contained in the state rule. In general, the state or local agency has adopted the applicable standard through the date as noted in the table. The second date is the most recent effective date of the state agency rule for which the EPA has granted the delegation. This notice specifically addresses revisions to the columns for Iowa, Kansas, Missouri, and Nebraska and the local agencies of Lincoln-

    Lancaster County, Nebraska, and the city of Omaha, Nebraska. If there are no dates listed in the delegation table, the state has not accepted delegation of the standard and implementation of those standards reside with EPA.

  10. What has not been delegated?

    1. The EPA regulations effective after the first date specified in each block have not been delegated, and authority for implementation of these regulations is retained solely by EPA.

    2. In some cases, the standards themselves specify that specific provisions cannot be delegated. In such cases, a specific section of the standard details what authorities can and cannot be delegated. You should review the applicable standard in the CFR for this information.

    3. In some cases, the state rules do not adopt the Federal standard in its entirety. Each state rule (available from the respective agency) should be consulted for specific information.

    4. In some cases, existing delegation agreements between the EPA and the agencies limit the scope of the delegated standards. Copies of delegation agreements are available from the state agencies, or from this office.

    5. With respect to 40 CFR part 63, subpart A, General Provisions (see Table III), EPA has determined that sections 63.6(g), 63.6(h)(9), 63.7(e)(2)(ii) and (f), 63.8(f), and 63.10(f) cannot be delegated. Additional information is contained in an EPA memorandum titled ``Delegation of 40 CFR Part 63 General Provisions Authorities to State and Local Air Pollution Control Agencies'' from John Seitz, Director, Office of Air Quality Planning and Standards, dated July 10, 1998.

    List of Delegation Tables

    Table I--Delegation of Authority--Part 60 NSPS--Region 7

    ----------------------------------------------------------------------------------------------------------------

    State of

    Sub-Part Source category State of Iowa State of Kansas State of Missouri Nebraska

    ----------------------------------------------------------------------------------------------------------------

    A............... General Provisions 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Except 60.4; 60.9; Except 60.4; 60.9;

    60.10; 60.16. and 60.10.

    D............... Fossil-Fuel Fired 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Steam Generators 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    for Which

    Construction is

    Commenced After

    August 17, 1971.

    Da.............. Electric Utility 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Steam Generating 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Units for Which

    Construction is

    Commenced After

    September 18,

    1978.

    Db.............. Industrial- 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Commercial- 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Institutional

    Steam Generating

    Units.

    Dc.............. Small Industrial- 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Commercial- 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Institutional

    Steam Generating

    Units.

    E............... Incinerators...... 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Ea.............. Municipal Waste 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Combustors for 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Which

    Construction is

    Commenced After

    December 20,

    1989, and on or

    before September

    20 1994.

    Eb.............. Large Municipal 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Waste Combustors 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    for Which

    Construction is

    Commenced after

    September 20,

    1994, or for

    Which

    Modification or

    Reconstruction is

    Commenced After

    June 19, 1996.

    Page 71512

    Ec.............. Hospital/Medical/ 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Infectious Waste 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Incinerators for

    Which

    Construction

    Commenced after

    June 20, 1996.

    F............... Portland Cement 10/17/00.......... 07/01/08.......... 6/30/11........... 07/01/09

    Plants. 10/21/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    G............... Nitric Acid Plants 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    H............... Sulfuric Acid 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Plants. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    I............... Hot Mix Asphalt 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Facilities. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    J............... Petroleum 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Refineries. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Except provisions

    in Ja:

    60.100a(c); in

    60.101a, the

    definition of

    ``flare'';

    60.102a(g); and

    60.107a(d) and

    (e).

    Ja.............. Standards of .................. 6/30/11........... 07/01/09

    Performance for 12/30/12.......... 12/22/12

    Petroleum

    Refineries for

    Which

    Construction,

    Reconstruction,

    or Modification

    Commenced After

    May 14, 2007.

    K............... Storage Vessels 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    for Petroleum 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Liquids for Which

    Construction,

    Reconstruction,

    or Modification

    Commenced After

    June 11, 1973,

    and Prior to May

    19, 1978.

    Ka.............. Storage Vessels 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    for Petroleum 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Liquids for Which

    Construction,

    Reconstruction,

    or Modification

    Commenced After

    May 18, 1978, and

    Prior to July 23,

    1984.

    Kb.............. Volatile Organic 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Liquid Storage 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Vessels

    (including

    Petroleum Liquid

    Storage Vessels)

    for Which

    Construction,

    Reconstruction,

    or Modification

    Commenced After

    July 23, 1984.

    L............... Secondary Lead 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Smelters. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    M............... Secondary Brass 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    and Bronze 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Production Plants.

    N............... Basic Oxygen 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Process Furnaces 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    for Which

    Construction is

    Commenced After

    June 11, 1973.

    Na.............. Basic Oxygen 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Process 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Steelmaking

    Facilities for

    Which

    Construction is

    Commenced After

    January 20, 1983.

    O............... Sewage Treatment 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Plants. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    P............... Primary Copper 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Smelters. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Page 71513

    Q............... Primary Zinc 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Smelters. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    R............... Primary Lead 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Smelters. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    S............... Primary Aluminum 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Reduction Plants. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    T............... Phosphate 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Fertilizer 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Industry: Wet

    Process

    Phosphoric Acid

    Plants.

    U............... Phosphate 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Fertilizer 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Industry:

    Superphosphoric

    Acid Plants.

    V............... Phosphate 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Fertilizer 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Industry:

    Diammonium

    Phosphate Plants.

    W............... Phosphate 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Fertilizer 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Industry: Triple

    Superphosphate

    Plants.

    X............... Phosphate 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Fertilizer 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Industry:

    Granular Triple

    Superphosphate

    Storage

    Facilities.

    Y............... Coal Preparation 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Plants. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Z............... Ferroalloy 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Production 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Facilities.

    AA.............. Steel Plants: 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Electric Arc 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Furnaces

    Constructed After

    October 21, 1974,

    and on or Before

    August 17, 1983.

    AAa............. Steel Plants: 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Electric Arc 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Furnaces and

    Argon-Oxygen

    Decarburization

    Vessels

    Constructed After

    August 17, 1983.

    BB.............. Kraft Pulp Mills.. 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    CC.............. Glass 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Manufacturing 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Plants.

    DD.............. Grain Elevators... 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    EE.............. Surface Coating of 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Metal Furniture. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    GG.............. Stationary Gas 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Turbines. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    HH.............. Lime Manufacturing 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Plants. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    KK.............. Lead-Acid Battery 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Manufacturing 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Plants.

    LL.............. Metallic Mineral 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Processing Plants. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    MM.............. Automobile and 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Light Duty Truck 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Surface Coating

    Operations.

    NN.............. Phosphate Rock 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Plants. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    PP.............. Ammonium Sulfate 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Manufacture. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    QQ.............. Graphic Arts 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Industry: 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Publication

    Rotogravure

    Printing.

    RR.............. Pressure Sensitive 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Tape and Label 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Surface Coating

    Operations.

    SS.............. Industrial Surface 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Coating: Large 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Appliances.

    TT.............. Metal Coil Surface 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Coating. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Page 71514

    UU.............. Asphalt Processing 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    and Asphalt 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Roofing

    Manufacture.

    VV.............. Equipment Leaks of 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    VOC in the 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Synthetic Organic

    Chemicals

    Manufacturing

    Industry.

    Wa.............. Equipment Leaks of .................. .................. 6/30/11........... 07/01/09

    VOC in the 12/30/12.......... 12/22/12

    Synthetic Organic

    Chemicals

    Manufacturing

    Industry for

    Which

    Construction,

    Reconstruction,

    or Modification

    Commenced After

    November 7, 2006.

    WW.............. Beverage Can 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Surface Coating 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Industry.

    XX.............. Bulk Gasoline 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Terminals. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    AAA............. New Residential 07/01/08.......... 6/30/11........... 07/01/09

    Wood Heaters. 11/05/10.......... 12/30/12.......... 12/22/12

    BBB............. Rubber Tire 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Manufacturing 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Industry.

    DDD............. Volatile Organic 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Compound (VOC) 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Emissions from

    the Polymer

    Manufacturing

    Industry.

    FFF............. Flexible Vinyl and 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Urethane Coating 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    and Printing.

    GGG............. Equipment Leaks of 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    VOC in Petroleum 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Refineries.

    GGGa............ Equipment Leaks of .................. .................. 6/30/11........... 07/01/09

    VOC in Petroleum 12/30/12.......... 12/22/12

    Refineries for

    Which

    Construction,

    Reconstruction,

    or Modification

    Commenced After

    November 7, 2006.

    HHH............. Synthetic Fiber 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Production 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Facilities.

    III............. Volatile Organic 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Compound (VOC) 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Emissions From

    the Synthetic

    Organic Chemical

    Manufacturing

    Industry (SOCMI)

    AIR Oxidation

    Unit Processes.

    JJJ............. Petroleum Dry 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Cleaners. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    KKK............. Equipment Leaks of 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    VOC from Onshore 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Natural Gas

    Processing Plants.

    LLL............. Onshore Natural 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Gas Processing: 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    SO2 Emissions.

    NNN............. Volatile Organic 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Compound (VOC) 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Emissions from

    Synthetic Organic

    Chemical

    Manufacturing

    Industry (SOCMI)

    Distillation

    Operations.

    OOO............. Nonmetallic 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Mineral 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Processing Plants.

    PPP............. Wool Fiberglass 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Insulation 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Manufacturing

    Plants.

    QQQ............. VOC Emissions from 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Petroleum 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Refinery

    Wastewater

    Systems.

    Page 71515

    RRR............. Volatile Organic 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Compound 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Emissions from

    Synthetic Organic

    Chemical

    Manufacturing

    Industry (SOCMI)

    Reactor Processes.

    SSS............. Magnetic Tape 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Coating 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Facilities.

    TTT............. Industrial Surface 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Coating: Surface 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Coating of

    Plastic Parts for

    Business Machines.

    UUU............. Calciners and 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Dryers in Mineral 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Industries.

    VVV............. Polymeric Coating 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    of Supporting 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Substrates

    Facilities.

    WWW............. Municipal Solid 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Waste Landfills. 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    AAAA............ Small Municipal 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Waste Combustion 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Units for Which

    Construction is

    Commenced After

    August 30, 1999

    or for Which

    Modification or

    Reconstruction is

    Commenced After

    June 6, 2001.

    CCCC............ Commercial and 06/28/11.......... 07/01/05.......... 6/30/11........... 07/01/09

    Industrial Solid 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Waste

    Incineration

    Units for Which

    Construction is

    Commenced After

    November 30, 1999

    or for Which

    Modification or

    Reconstruction is

    Commenced on or

    After June 1,

    2001.

    DDDD............ Commercial and 07/01/05.......... 07/01/09

    Industrial Solid 11/05/10.......... 12/22/12

    Waste

    Incineration

    Units that

    Commenced

    Construction On

    or Before

    November 30, 1999.

    EEEE............ Other Solid Waste 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Incineration 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Units for Which

    Construction

    Commenced After

    December 9, 2004

    or Modification

    or Reconstruction

    Commenced On or

    After June 16,

    2006.

    FFFF............ Other Solid Waste 07/01/08.......... 07/01/09

    Incineration 11/05/10.......... 12/22/12

    Units that

    Commenced

    Construction On

    or Before

    December 9, 2004.

    IIII............ Stationary 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Compression 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Ignition Internal

    Combustion

    Engines.

    JJJJ............ Stationary Spark 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Ignition Internal 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Combustion

    Engines.

    KKKK............ Stationary 06/28/11.......... 07/01/08.......... 6/30/11........... 07/01/09

    Combustion 10/24/12.......... 11/05/10.......... 12/30/12.......... 12/22/12

    Turbines.

    LLLL............ New Sewage Sludge .................. .................. 6/30/11........... ..............

    Incinerator Units. 12/30/12..........

    ----------------------------------------------------------------------------------------------------------------

    Page 71516

    TABLE II--Delegation of Authority--Part 61 NESHAP--Region 7

    --------------------------------------------------------------------------------------------------------------------------------------------------------

    Lincoln-

    Sub-Part Source category State of Iowa State of Kansas State of Missouri State of Lancaster City of Omaha

    Nebraska County

    --------------------------------------------------------------------------------------------------------------------------------------------------------

    A.................. General Provisions... 9/19/11 07/01/10............. 12/31/08............. 07/01/01 07/01/01 07/01/01

    10/24/12 12/28/12............. 05/30/10............. 07/21/10 08/24/10 04/02/12

    Except 61.4, 61.16 Except 61.4, 61.16

    and 61.17. and 61.17.

    B.................. Radon Emissions from .............. ..................... ..................... .............. .............. ..............

    Underground Uranium

    Mines.

    C.................. Beryllium............ 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    D.................. Beryllium Rocket 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    Motor Firing. 10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    E.................. Mercury.............. 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    F.................. Vinyl Chloride....... 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    J.................. Equipment Leaks 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    (Fugitive Emission 10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    Sources) of Benzene.

    L.................. Benzene Emissions 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    from Coke By-Product 10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    Recovery Plants.

    M.................. Asbestos............. 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    N.................. Inorganic Arsenic 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    Emissions from Glass 10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    Manufacturing Plants.

    O.................. Inorganic Arsenic 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    Emissions From 10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    Primary Copper

    Smelters.

    P.................. Inorganic Arsenic 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    Emissions From 10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    Arsenic Trioxide and

    Metallic Arsenic

    Production

    Facilities.

    Q.................. Radon Emissions From .............. ..................... ..................... .............. .............. ..............

    Department of Energy

    Facilities.

    R.................. Radon Emissions From .............. ..................... ..................... .............. .............. ..............

    Phosphogypsum Stacks.

    T.................. Radon Emissions From .............. ..................... ..................... .............. .............. ..............

    the Disposal of

    Uranium Mill

    Tailings.

    V.................. Equipment Leaks 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    (Fugitive Emission 10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    Sources).

    W.................. Radon Emissions From .............. ..................... ..................... .............. .............. ..............

    Operating Mill

    Tailings.

    Y.................. Benzene Emissions 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    From Benzene Storage 10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    Vessels.

    BB................. Benzene Emissions 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    From Benzene 10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    Transfer Operations.

    FF................. Benzene Waste 9/19/11 07/01/10............. 6/30/11.............. 07/01/01 07/01/01 07/01/01

    Operations. 10/24/12 12/28/12............. 12/30/12............. 07/21/10 08/24/10 04/02/12

    --------------------------------------------------------------------------------------------------------------------------------------------------------

    Page 71517

    Table III--Delegation of Authority--Part 63 NESHAP--Region 7

    --------------------------------------------------------------------------------------------------------------------------------------------------------

    Lincoln-

    Sub-part Source category State of Iowa State of Kansas State of State of Lancaster City of Omaha

    Missouri Nebraska county

    --------------------------------------------------------------------------------------------------------------------------------------------------------

    A....................... General Provisions.... 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    10/24/12 12/28/12.............. 12/30/12 12/22/12 08/24/10 04/02/12

    .............. Except 63.6(f)(1), Except 63.13 &

    (g), (h)(1) and 63.15(a)(2)

    (h)(9);

    63.7(e)(2)(ii) and

    (f); 63.8(f);

    63.10(f); 63.12;

    63.13; 63.14(b)(27)

    and phrase ``and

    table 5 to subpart

    DDDDD of this part'';

    63.14(b)(35), (39)

    through (53), and

    (55) through (62); in

    63.14(i)(1), the

    phrase ``table 5 to

    subpart DDDDD of this

    part''; and 63.15.

    F....................... Organic Hazardous Air 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Pollutants From the 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Synthetic Organic

    Chemical

    Manufacturing

    Industry.

    G....................... Organic Hazardous Air 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Pollutants From the 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Synthetic Organic

    Chemical

    Manufacturing

    Industry for Process

    Vents, Storage

    Vessels, Transfer

    Operations, and

    Wastewater.

    H....................... Organic Hazardous Air 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Pollutants for 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Equipment Leaks.

    I....................... Organic Hazardous Air 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Pollutants for 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Certain Processes

    Subject to the

    Negotiated Regulation

    for Equipment Leaks.

    J....................... Polyvinyl Chloride and 9/19/11 07/01/10.............. .............. .............. .............. ..............

    Copolymers Production. 10/24/12 12/28/12.............. .............. .............. .............. ..............

    L....................... Coke Oven Batteries... 9/19/11 07/01/10.............. 6/30/11 .............. .............. ..............

    10/24/12 12/28/12.............. 12/30/12 .............. .............. ..............

    M....................... National 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Perchloroethylene Air 10/24/12 12/28/12.............. 12/30/12 12/22/12 08/24/10 04/02/12

    Emission Standards

    for Dry Cleaning

    Facilities.

    N....................... Chromium Emissions 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    From Hard and 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Decorative Chromium

    Electroplating and

    Chromium Anodizing

    Tanks.

    Page 71518

    O....................... Ethylene Oxide 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Emissions Standards 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    for Sterilization

    Facilities.

    Q....................... Industrial Process 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Cooling Towers. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    R....................... Gasoline Distribution 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Facilities (Bulk 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Gasoline Terminals

    and Pipeline Breakout

    Stations).

    S....................... Pulp and Paper 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Industry. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    T....................... Halogenated Solvent 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Cleaning. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    U....................... Polymers and Resins 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Group I. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    W....................... Epoxy Resins 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Production and Non- 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Nylon Polyamides

    Production.

    X....................... Secondary Lead 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Smelting. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Y....................... Marine Tank Vessel 9/19/11 07/01/10.............. 6/30/11 .............. .............. ..............

    Loading Operations. 10/24/12 12/28/12.............. 12/30/12 .............. .............. ..............

    AA/BB................... Phosphoric Acid 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Manufacturing Plants/ 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Phosphate Fertilizers

    Production Plants.

    CC...................... Petroleum Refineries.. 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    DD...................... Off-Site Waste and 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Recovery Operations. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    EE...................... Magnetic Tape 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Manufacturing 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Operations.

    GG...................... Aerospace Industry 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Surface Coating 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Manufacturing and

    Rework Facilities.

    HH...................... Oil and Natural Gas 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Production Facilities. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    II...................... Shipbuilding and Ship 9/19/11 07/01/10.............. 6/30/11 .............. .............. ..............

    Repair (Surface 10/24/12 12/28/12.............. 12/30/12 .............. .............. ..............

    Coating).

    JJ...................... Wood Furniture 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Manufacturing 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Operations.

    KK...................... Printing and 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Publishing Industry. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    LL...................... Primary Aluminum 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Reduction Plants. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    MM...................... Chemical Recovery 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Combustion Sources at 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    Kraft, Soda, Sulfite,

    and Stand-Along

    Semichemical Pulp

    Mills.

    OO...................... Tanks-Level 1......... 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    PP...................... Containers............ 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Page 71519

    QQ...................... Surface Impoundments.. 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    RR...................... Individual Drain 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Systems. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    SS...................... Closed Vent Systems, 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Control Devices, 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Recovery Devices and

    Routing to a Fuel Gas

    System or a Process.

    TT...................... Equipment Leaks-- 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Control Level 1 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Standards.

    UU...................... Equipment Leaks-- 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Control Level 2 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Standards.

    VV...................... Oil-Water Separators 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    and Organic-Water 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Separators.

    WW...................... Storage Vessel 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    (Tanks)--Control 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Level 2.

    XX...................... Ethylene Manufacturing 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Process Units: Heat 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    Exchange Systems and

    Waste Operations.

    YY...................... Generic Maximum 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Achievable Control 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Technology Standards.

    CCC..................... Steel Pickling-HCL 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Process Facilities 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    and Hydrochloric Acid

    Regeneration Plants.

    DDD..................... Mineral Wool 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Production. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    EEE..................... Hazardous Waste 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Combustors. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    GGG..................... Pharmaceutical 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Production. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    HHH..................... Natural Gas 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Transmission and 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Storage Facilities.

    III..................... Flexible Polyurethane 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Foam Production. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    JJJ..................... Polymers and Resins 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Group IV. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    LLL..................... Portland Cement 12/20/06 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Manufacturing 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Industry.

    MMM..................... Pesticide Active 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Ingredient Production. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    NNN..................... Wool Fiberglass 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Manufacturing. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    OOO..................... Manufacture of Amino/ 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Phenolic Resins. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    PPP..................... Polyether Polyols 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Production. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    QQQ..................... Primary Copper 9/19/11 07/01/10.............. 6/30/11 .............. .............. ..............

    Smelting. 10/24/12 12/28/12.............. 12/30/12 .............. .............. ..............

    RRR..................... Secondary Aluminum 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Production. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Page 71520

    TTT..................... Primary Lead Smelting. 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    UUU..................... Petroleum Refineries.. 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    VVV..................... Publicly Owned 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Treatment Works. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    XXX..................... Ferroalloys Production 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    AAAA.................... Municipal Solid Waste 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Landfills. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    CCCC.................... Manufacturing of 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Nutritional Yeast. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    DDDD.................... Plywood and Composite 9/19/11 07/01/10.............. 6/30/11 .............. .............. ..............

    Wood Products. 10/24/12 12/28/12.............. 12/30/12 .............. .............. ..............

    EEEE.................... Organic Liquids 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Distribution (Non- 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    Gasoline).

    FFFF.................... Misc. Organic Chemical 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Manufacturing. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    GGGG.................... Solvent Extraction for 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Vegetable Oil 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Production.

    HHHH.................... Wet Formed Fiberglass 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Mat Production. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    IIII.................... Surface Coating of 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Automobiles and Light- 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    Duty Trucks.

    JJJJ.................... Paper and Other Web 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Coating. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    KKKK.................... Surface Coating of 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Metal Cans. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    MMMM.................... Surface Coating of 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Misc. Metal Parts and 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Products.

    NNNN.................... Surface Coating of 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Large Appliances. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    OOOO.................... Printing, Coating and 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Dyeing of Fabrics and 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Other Textiles.

    PPPP.................... Surface Coating of 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Plastic Parts and 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Products.

    QQQQ.................... Surface Coating of 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Wood Building 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Products.

    RRRR.................... Surface Coating of 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Metal Furniture. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    SSSS.................... Surface Coating of 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Metal Coil. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    TTTT.................... Leather Finishing 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Operations. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    UUUU.................... Cellulose Products 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Manufacturing. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    VVVV.................... Boat Manufacturing.... 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    WWWW.................... Reinforced Plastic 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Composites Production. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    XXXX.................... Rubber Tire 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Manufacturing. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    YYYY.................... Stationary Combustion 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Turbines. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    ZZZZ.................... Stationary 4/20/06 7/1/09................ 6/30/11 07/01/11 07/01/09 07/01/11

    Reciprocating 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Internal Combustion

    Engines.

    Page 71521

    AAAAA................... Lime Manufacturing 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Plants. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    BBBBB................... Semiconductor 9/19/11 07/01/10.............. 6/30/11 .............. .............. ..............

    Manufacturing. 10/24/12 12/28/12.............. 12/30/12 .............. .............. ..............

    CCCCC................... Coke Ovens: Pushing, 9/19/11 07/01/10.............. 6/30/11 .............. .............. ..............

    Quenching, and 10/24/12 12/28/12.............. 12/30/12 .............. .............. ..............

    Battery Stacks.

    DDDDD................... Industrial, Commercial .............. ...................... 6/30/11 .............. .............. ..............

    and Institutional .............. ...................... 12/30/12 .............. .............. ..............

    Boilers and Process

    Heaters.

    EEEEE................... Iron and Steel 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Foundries. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    FFFFF................... Integrated Iron and 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Steel Manufacturing 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    Facilities.

    GGGGG................... Site Remediation...... 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    HHHHH................... Misc. Coating 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Manufacturing. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    IIIII................... Mercury Cell Chlor- 9/19/11 07/01/10.............. 6/30/11 .............. .............. ..............

    Alkali Plants. 10/24/12 12/28/12.............. 12/30/12 .............. .............. ..............

    JJJJJ................... Brick and Structural .............. ...................... .............. .............. .............. ..............

    Clay Products .............. ...................... .............. .............. .............. ..............

    Manufacturing.

    KKKKK................... Clay Ceramics 9/19/11 ...................... .............. .............. .............. ..............

    Manufacturing. 10/24/12 ...................... .............. .............. .............. ..............

    LLLLL................... Asphalt Processing and 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Asphalt Roofing 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Manufacturing.

    MMMMM................... Flexible Poly-urethane 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Foam Fabrication 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Operation.

    NNNNN................... Hydrochloric Acid 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Production. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    PPPPP................... Engine Test Cells/ 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Stands. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    QQQQQ................... Friction Materials 9/19/11 07/01/10.............. 6/30/11 .............. .............. ..............

    Manufacturing 10/24/12 12/28/12.............. 12/30/12 .............. .............. ..............

    Facilities.

    RRRRR................... Taconite Iron Ore 9/19/11 07/01/10.............. 6/30/11 .............. .............. ..............

    Processing. 10/24/12 12/28/12.............. 12/30/12 .............. .............. ..............

    SSSSS................... Refractory Products 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Manufacturing. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    TTTTT................... Primary Magnesium 9/19/11 07/01/10.............. 6/30/11 .............. .............. ..............

    Refining. 10/24/12 12/28/12.............. 12/30/12 .............. .............. ..............

    UUUUU................... Coal and Oil-fired .............. 07/01/10.............. 6/30/11 .............. .............. ..............

    Electric Utility 12/28/12.............. 12/30/12 .............. .............. ..............

    Steam Generating

    Units.

    WWWWW................... Hospital Ethylene 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Oxide Sterilizer. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    YYYYY................... Electric Arc Furnace 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Steelmaking 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    Facilities or

    Stainless and Non-

    stainless Steel

    Manufacturing (EAFs).

    ZZZZZ................... Iron and Steel 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Foundries Area 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Sources.

    BBBBBB.................. Gasoline Distribution 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Bulk Terminal, Bulk 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Plant and Pipeline

    Facilities.

    Page 71522

    CCCCCC.................. Gasoline Distribution, 1/24/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Gasoline Dispensing 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Facilities.

    DDDDDD.................. PVC & Copolymer .............. 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Production. .............. 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    EEEEEE.................. Primary Copper .............. 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Smelting. .............. 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    FFFFFF.................. Secondary Copper .............. 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Smelting. .............. 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    GGGGGG.................. Primary Nonferrous .............. 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Metal. .............. 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    HHHHHH.................. Paint Stripping 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Operations, Misc. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    Surface Coating,

    Autobody Refinishing.

    JJJJJJ.................. Industrial, .............. 07/01/10.............. 6/30/11 .............. .............. ..............

    Commercial, and 12/28/12.............. 12/30/12

    Institutional Boilers.

    LLLLLL.................. Acrylic/Modacrylic 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. ..............

    Fibers Production. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. ..............

    MMMMMM.................. Carbon Black 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. ..............

    Production. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. ..............

    NNNNNN.................. Chromium Compounds.... 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. ..............

    10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. ..............

    OOOOOO.................. Flexible Polyurethane 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 ..............

    Foam Fabrication and 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 ..............

    Production.

    PPPPPP.................. Lead Acid Battery 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. ..............

    Manufacturing. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. ..............

    QQQQQQ.................. Wood Preserving....... 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. ..............

    10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. ..............

    RRRRRR.................. Clay Ceramics 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 07/01/11

    Manufacturing. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 04/02/12

    SSSSSS.................. Pressed & Blown Glass 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Manufacturing. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    TTTTTT.................. Secondary Non-Ferrous 9/19/11 07/01/10.............. 6/30/11 07/01/11 .............. 07/01/11

    Metals. 10/24/12 12/28/12.............. 12/30/12 12/22/12 .............. 04/02/12

    VVVVVV.................. Chemical Manufacturing .............. 07/01/10.............. 6/30/11 07/01/11 07/01/09 ..............

    Area Sources. .............. 12/28/12.............. 12/30/12 12/22/12 09/28/10 ..............

    WWWWWW.................. Plating and Polishing. 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 ..............

    10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 ..............

    XXXXXX.................. Metal Fabrication and 9/19/11 07/01/10.............. 6/30/11 07/01/11 07/01/09 ..............

    Finishing. 10/24/12 12/28/12.............. 12/30/12 12/22/12 09/28/10 ..............

    YYYYYY.................. Ferroalloys Production .............. 07/01/10.............. 6/30/11 07/01/11 .............. ..............

    .............. 12/28/12.............. 12/30/12 12/22/12

    ZZZZZZ.................. Area Source Standards 6/28/11 07/01/10.............. 6/30/11 07/01/11 .............. ..............

    for Aluminum, Copper 1/24/11 12/28/12.............. 12/30/12 12/22/12 .............. ..............

    and Other Nonferrous

    Foundries.

    AAAAAAA................. Asphalt Processing and .............. 07/01/10.............. 6/30/11 07/01/11 .............. ..............

    Asphalt Roofing 12/28/12.............. 12/30/12 12/22/12 .............. ..............

    Manufacturing.

    BBBBBBB................. Chemical Preparations .............. 07/01/10.............. 6/30/11 07/01/11 12/30/09 ..............

    Industry. 12/28/12.............. 12/30/12 12/22/12 .............. ..............

    CCCCCCC................. Paints and Allied 6/28/11 07/01/10.............. 6/30/11 07/01/11 06/03/10 ..............

    Products 1/24/11 12/28/12.............. 12/30/12 12/22/12 .............. ..............

    Manufacturing.

    DDDDDDD................. Prepared Foods .............. 07/01/10.............. 6/30/11 07/01/11 07/20/10 ..............

    Manufacturing. .............. 12/28/12.............. 12/30/12 12/22/12 .............. ..............

    EEEEEEE................. Gold Mine Ore .............. 07/01/10.............. 6/30/11 07/01/11 .............. ..............

    Processing and .............. 12/28/12.............. 12/30/12 12/22/12 .............. ..............

    Production Area

    Source Category.

    --------------------------------------------------------------------------------------------------------------------------------------------------------

    Page 71523

    Summary of This Action

    All sources subject to the requirements of 40 CFR parts 60, 61, and 63 are also subject to the equivalent requirements of the above-

    mentioned state or local agencies.

    This document informs the public of delegations to the above-

    mentioned agencies of the above-referenced Federal regulations.

    Authority

    This document is issued under the authority of sections 101, 110, 112, and 301 of the CAA, as amended (42 U.S.C. 7401, 7410, 7412, and 7601).

    Dated: November 8, 2013.

    Karl Brooks,

    Regional Administrator, Region 7.

    FR Doc. 2013-28243 Filed 11-27-13; 8:45 am

    BILLING CODE 6560-50-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT