Pipeline Safety: Hazardous liquid and carbon dioxide pipelines; corrosion control standards; correction,

[Federal Register: November 20, 2002 (Volume 67, Number 224)]

[CORRECTIONS]

[Page 70118]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr20no02-127]

DEPARTMENT OF TRANSPORTATION

Research and Special Programs Administration

49 CFR Part 195

[Docket No. RSPA-97-2762; Amdt. 195-73]

RIN 2137-AD24

Controlling Corrosion on Hazardous Liquid and Carbon Dioxide Pipelines

Correction

In rule document 01-31655 beginning on page 66994 in the issue of Thursday, December 27, 2001, make the following correction:

Sec. 195.573 [Corrected]

On page 67006, in Sec. 195.573 (c), in the first column, the table is corrected to read as set forth below.

Device

Check frequency

Rectifier................................. At least six times each calendar year, but with intervals not exceeding 2\1/ 2\ months. Reverse current switch.................... ............................ Diode..................................... ............................ Interference bond whose failure would ............................ jeopardize structural protection.

Other interference bond................... At least once each calendar year, but with intervals not exceeding 15 months.

[FR Doc. C1-31655 Filed 11-19-02; 8:45 am]

BILLING CODE 1505-01-D

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT