Environmental Impact Statements; Availability, etc.: Little Sandy Trail Creek Watershed Structure No. 1; Madison County, GA

Federal Register: July 15, 2009 (Volume 74, Number 134)

Notices

Page 34297-34298

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr15jy09-47

DEPARTMENT OF AGRICULTURE

Natural Resources Conservation Service; Little Sandy Trail Creek

Watershed Structure No. 1: Madison County, GA

AGENCY: Natural Resources Conservation Service.

ACTION: Notice of Availability of a Finding of No Significant Impact.

SUMMARY: Pursuant to Section 102(2) (C) of the National Environmental

Policy Act of 1969, the Council on Environmental Quality Regulations

(40 CFR Part 1500); and the Natural Resources Conservation Service

Regulations (7 CFR Part 650); the Natural Resources Conservation

Service, U.S. Department of Agriculture, gives notice that an environmental impact statement is not being prepared for the Little

Sandy Trail Creek Watershed Structure No. 1, Madison County, Georgia.

FOR FURTHER INFORMATION CONTACT: Cran Upshaw, Economist, Federal

Building, 355 East Hancock Avenue, Athens, Georgia 30601, Telephone

(706) 546-2277, e-mail cran.upshaw@ga.usda.gov.

SUPPLEMENTARY INFORMATION: The Environmental Assessment of this federally assisted action indicates that the project will not cause significant local, regional, or national impacts on the environment. As a result of these findings, James E. Tillman, Sr., State

Conservationist, has determined that the preparation and review of an environmental impact statement is not needed for this project.

The project purpose is continued flood prevention. The planned works of improvement include upgrading an existing floodwater retarding structure.

The Notice of a Finding of No Significant Impact (FONSI) has been forwarded to the U.S. Environmental Protection Agency and to various

Federal, State, and local agencies and interest parties. A limited number of the FONSI are available to fill single copy requests at the above address. Basic data developed during the environmental assessment are on file and may be reviewed by contacting Cran Upshaw at the above number.

No administrative action on implementation of the proposal will be taken until 30 days after the date of this publication in the Federal

Register.

Signed in Athens, Georgia, on July 2, 2009.

James E. Tillman, Sr.

State Conservationist.

(This activity is listed in the Catalog of Federal Domestic

Assistance under 10.916, Watershed Protection and Flood Prevention, and is subject to the provisions of Executive Order 12372, which requires inter-government consultation with State and local officials).

Finding of No Significant Impact for Little Sandy Trail Creek Watershed

Structure No. 1; Madison County, Georgia, July 3, 2009

Introduction

The Little Sandy Trail Creek Watershed is a federally assisted action authorized for planning under Public Law 106-472, the Watershed

Rehabilitation Act, which amends Public Law 83-566, the Watershed

Protection and Flood Prevention Act. An environmental assessment was undertaken in conjunction with development of the watershed plan. This assessment was conducted in consultation with local, State, and Federal agencies as well as with interested organizations and individuals. Data developed during the assessment are available for public review at the following location: U.S. Department of Agriculture, Natural Resources

Conservation Service, 355 East Hancock Avenue, Athens, Georgia 30601.

Recommended Action

This document describes a plan for upgrading an existing floodwater retarding structure, Little Sandy Trail Creek Watershed Structure No. 1, to meet current dam safety criteria in Georgia. The plan calls for the modification of the existing vegetative auxiliary spillway, enlarging the principal spillway and raising the top of the dam on an existing dam. Works of improvement will be accomplished by providing financial and technical assistance through an eligible local sponsor.

The Principal Project Measures are to: 1. Modifying the existing vegetative auxiliary spillway, enlarging the principal spillway and raising the top of the dam. This construction is designed to bring the existing dam into compliance with current dam safety criteria in Georgia. 2. The measures will be planned and installed by developing a contract with the current operator of the dam.

Effects of Recommended Action

Modifying the existing vegetative auxiliary spillway, enlarging the principal spillway and raising the top of the dam will bring Little

Sandy Trail Creek Watershed Structure No. 1 into compliance with current dam safety criteria. This will essentially eliminate the risk to loss of life for individuals in 6 homes and 10 roads downstream.

Additional effects will include continued protection against flooding, continued water quality benefits, continued fishing activities, continued recreational opportunities, protected land values, protected road and utility networks, and reduced maintenance costs for public infrastructure.

Wildlife habitat will not be disturbed during installation activities. No wetlands, wildlife habitat, fisheries, prime farmland, or cultural resources will be destroyed or threatened by this project.

Some 30 acres of wetland and wetland type wildlife habitat will be preserved. Fishery habitats will also be maintained.

No endangered or threatened plant or animal species will be adversely affected by the project.

There are no wilderness areas in the watershed.

Alternatives

Six alternative plans of action were considered in project planning. No significant adverse environmental impacts are anticipated from installation of the selected alternative. Also, the planned action is the most practical, complete, and acceptable means of protecting life and property of downstream residents.

Consultation--Public Participation

Original sponsoring organizations include the Georgia Soil and

Water Conservation Commission, Broad River Soil and Water Conservation

District and Madison County. At the initiation of the planning process, meetings were held with representatives of the original sponsoring organizations to ascertain their interest and concerns regarding the

Little Sandy Trail Creek Watershed. The Georgia Soil and Water

Conservation Commission agreed to serve as ``lead sponsor'' being responsible for leading the planning process with assistance from NRCS.

As lead sponsor they also agreed to provide non-federal cost-share, property rights, operation and maintenance, and public participation during, and beyond, the planning process.

An Interdisciplinary Planning Team provided for the ``technical'' administration of this project. Technical administration includes tasks pursuant to the NRCS nine-step planning process, and planning procedures outlined in the NRCS-National Planning Procedures Handbook.

Examples of tasks completed

Page 34298

by the Planning Team include, but are not limited to, Preliminary

Investigations, Hydrologic Analysis, Reservoir Sedimentation Surveys,

Economic Analysis, Formulating and Evaluating Alternatives, and Writing the Watershed Plan--Environmental Assessment. Data collected from partner agencies, databases, landowners, and others throughout the entire planning process were presented at the public meeting on May 27, 2009. Informal discussions amongst planning team members, partner agencies, and landowners were conducted throughout the entire planning period.

Public Participation

A public meeting was held on May 27, 2009 to explain the Watershed

Rehabilitation Program and to scope resource problems, issues, and concerns of local residents associated with the project area. Potential alternative solutions to bring Little Sandy Trail Creek No. 1 into compliance with current dam safety criteria were also presented.

Through a voting process, eleven meeting participants heard summaries of planning accomplishments to date, provided input on issues and concerns to be considered in the planning process, were made aware of results from the reservoir sedimentation survey, and identified which planning alternative (i.e., No Action, Decommission, Structural, Non-

Structural) was most desirable.

Conclusion

The Environmental Assessment summarized above indicates that this

Federal action will not cause significant adverse local, regional, or national impacts on the environment. Therefore, based on the above findings, I have determined that an environmental impact statement for the recommended plan of action on Little Sandy Trail Creek Watershed

Structure No. 1 is not required.

Dated: July 2, 2009.

James E. Tillman, Sr.,

State Conservationist.

FR Doc. E9-16786 Filed 7-14-09; 8:45 am

BILLING CODE 3410-16-P