N.M. Code R. § 20.11.3.104 Frequency of Conformity Determinations

LibraryNew Mexico Administrative Code
Edition2023
CurrencyCurrent through Register Vol. 34, No. 24, December 19, 2023
CitationN.M. Code R. § 20.11.3.104
Year2023

A. Conformity determinations and conformity redetermination for transportation plans, TIPs and FHWA/FTA projects shall be made according to the requirements of 20.11.3.104 NMAC and the applicable implementation plan.

B. Frequency of conformity determinations for transportation plans:

    (1) Each new transportation plan shall be demonstrated to conform before the transportation plan is approved by the MPO or accepted by DOT.
    (2) All transportation plan amendments shall be found to conform before the transportation plan amendments are approved by the MPO or accepted by DOT unless the amendment merely adds or deletes exempt projects listed in 20.11.3.126 NMAC or 20.11.3.127 NMAC. The conformity determination shall be based on the transportation plan and the amendment taken as a whole.
    (3) The MPO and DOT shall determine the conformity of the transportation plan (including a new regional emissions analysis) no less frequently than every four years. If more than four years elapse after DOT's conformity determination without the MPO and DOT determining conformity of the transportation plan, a 12-month grace period will be implemented as described in Subsection F of 20.11.3.104 NMAC. At the end of this 12-month grace period, the existing conformity determination shall lapse.

C. Frequency of conformity determinations for transportation improvement programs:

    (1) A new TIP shall be demonstrated to conform before the TIP is approved by the MPO or accepted by DOT.
    (2) A TIP amendment requires a new conformity determination for the entire TIP before the amendment is approved by the MPO or accepted by DOT, unless the amendment merely adds or deletes exempt projects listed in 20.11.3.126 NMAC or 20.11.3.127 NMAC and has been made in accordance with the notification provisions of Subparagraph (g) of Paragraph (1) of Subsection D of 20.11.3.105 NMAC.
    (3) The MPO and DOT shall determine the conformity of the TIP (including a new regional emissions analysis) no less frequently than every four years. If more than four years elapse after DOT's conformity determination without the MPO and DOT determining conformity of the TIP, a 12-month grace period will be implemented as described in Subsection F of 20.11.3.104 NMAC. At the end of this 12-month grace period, the existing conformity determination shall...

To continue reading

Request your trial

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT