N.M. Code R. § 20.11.61.26 Table 1- Psd Source Categories

LibraryNew Mexico Administrative Code
Edition2023
CurrencyCurrent through Register Vol. 34, No. 24, December 19, 2023
CitationN.M. Code R. § 20.11.61.26
Year2023

A. Carbon black plants (furnace process).

B. Charcoal production plants.

C. Chemical process plants (the term chemical processing plant shall not include ethanol production facilities that produce ethanol by natural fermentation included in NAICS Codes 325193 or 312140).

D. Coal cleaning plants (with thermal dryers).

E. Coke oven batteries.

F. Fossil fuel boilers (or combinations thereof) totaling more than 250 million BTU/hr heat input.

G. Fossil fuel-fired steam electric plants of more than 250 million BTU/hr heat input.

H. Fuel conversion plants.

I. Glass fiber processing plants.

J. Hydrofluoric acid plants.

K. Iron and steel mills.

L. Kraft pulp mills.

M. Lime plants.

N. Municipal incinerators capable of charging more than 250 tons of refuse per day.

O. Nitric acid plants.

P. Petroleum refineries.

Q. Petroleum storage and transfer units with a total storage capacity exceeding 300,000 barrels.

R. Phosphate rock processing plants.

S. Portland cement plants.

T. Primary aluminum ore reduction plants.

U. Primary copper smelters.

V. Primary lead smelters.

W. Primary zinc smelters.

X. Secondary metal production plants.

Y. Sintering plants.

Z. Sulfur recovery plants.

AA. Sulfuric acid plants.

BB. Taconite ore processing plants.


To continue reading

Request your trial

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT