Practice and procedure: Environmental regulations— Floodplain and wetland procedures,

[Federal Register: October 19, 1999 (Volume 64, Number 201)]

[Rules and Regulations]

[Page 56253-56256]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr19oc99-3]

POSTAL SERVICE

39 CFR Part 776

Floodplain and Wetland Procedures

AGENCY: Postal Service.

ACTION: Final rule.

SUMMARY: The Postal Service is changing its procedures regarding the acquisition and management of real property and construction of facilities in floodplains and wetlands. These changes simplify and clarify the responsibilities of the Postal Service with regard to public notification and procedures to be followed when evaluating postal facility actions that may involve construction projects in floodplains or wetlands.

EFFECTIVE DATE: November 1, 1999.

FOR FURTHER INFORMATION CONTACT: Technical information: Hank Burmeister, (201) 714-5431. Legal information: Jeff Meadows, (202) 268- 3009.

SUPPLEMENTARY INFORMATION: In 64 FR 48124, September 2, 1999, the Postal Service published a notice of proposed changes to its floodplain and wetland regulations that clarify and simplify the internal evaluation and decision-making processes for constructing facilities in floodplain and wetland areas, while ensuring public input and notice of these decisions. The Postal Service proposed to separate the requirements regarding floodplains, based upon Executive Order (EO) 11988, from the requirements regarding wetlands, based upon EO 11990. Experience over the years demonstrated that the prior procedures did not adequately balance the needs of local communities with the Postal Service's mandate to provide universal, prompt and efficient mail service while complying with environmental protection policies.

The floodplain procedures apply to construction of new postal facilities in floodplains. They also apply to other construction projects, including the expansion or renovation of existing facilities, that would increase the amount of impervious area in a floodplain, such as paving over a dirt and gravel parking lot. However, the procedural requirement to conduct a no practicable alternatives analysis will not apply to every construction project

[[Page 56254]]

located in a floodplain. The no practicable alternatives analysis also will not apply where the entire preferred area for the location of a postal facility, whether expanded, renovated or replaced, is in the floodplain.

The wetland procedures apply to construction of postal facilities in wetlands. For example, if construction is proposed in a wetland, the Postal Service must issue a written determination that there is no practicable alternative to such construction and that the proposed action includes all practicable mitigation measures.

The Postal Service will continue to review the potential environmental impacts and effects of facility actions even if a construction activity is not subject to the no practicable alternative review process and will incorporate appropriate mitigation measures into facilities projects.

The Postal Service requested that comments on the proposal be submitted by October 4, 1999. No comments were received by that date. The Postal Service is changing the language proposed in Sec. 776.5(f) from ``local newspaper reporters'' to ``local newspapers'' due to an editing error. In light of the foregoing, the Postal Service has decided to implement the proposed changes to its floodplain and wetland procedures.

List of Subjects in 39 CFR Part 776

Floodplains, Postal Service.

For the reasons stated in the preamble, the Postal Service revises 39 CFR part 776 to read as follows:

PART 776--FLOODPLAIN AND WETLAND PROCEDURES

Subpart A--General Provisions

Sec. 776.1 Purpose and policy. 776.2 Responsibility. 776.3 Definitions.

Subpart B--Floodplain Management

Sec. 776.4 Scope. 776.5 Review procedures. 776.6 Design requirements for construction. 776.7 Lease, easement, right-of-way, or disposal of property to non-federal parties.

Subpart C--Wetlands Protection

Sec. 776.8 Scope. 776.9 Review procedures. 776.10 Lease, easement, right-of-way, or disposal of property to non-Federal parties.

Authority: 39 U.S.C. 401.

Subpart A--General Provisions

Sec. 776.1 Purpose and policy.

(a) The regulations in this part implement the goals of Executive Orders 11990, Protection of Wetlands, and 11988, Floodplain Management, and are adopted pursuant to the Postal Reorganization Act, as the Postal Service does not meet the definition of the term ``agency'' used in the Executive Orders.

(b) The Postal Service intends to exercise leadership in the acquisition and management of real property, construction of facilities, and disposal of real property, located in floodplains and wetlands. Consistent with the goals of the Executive Orders, the regulations in this part are not intended to prohibit floodplain and wetland development in all circumstances, but rather to create a consistent policy to minimize adverse impacts.

Sec. 776.2 Responsibility.

The appropriate Manager, Facilities Service Office, or functional equivalent within the Postal Service's facilities organization, in conjunction with the appropriate Vice President, Area Operations, or functional equivalent within the Postal Service's operations organization, are responsible for overall compliance with the regulations in this part pertaining to facilities projects. The Vice President, Area Operations, is responsible for compliance with these regulations for those projects within the Vice President's delegated authority.

Sec. 776.3 Definitions.

Construction means construction, alterations, renovations, and expansions of buildings, structures and improvements.

Contending site means a site or existing building for a proposed postal facility action, which meets the requirements of the Postal Service as determined by the operations organization.

Facility means any building, appurtenant structures, or associated infrastructure.

Floodplain means the lowland and relatively flat areas adjoining inland and coastal waters including flood-prone areas of offshore islands, including, at a minimum, that area subject to a one percent or greater chance of flooding in any given year (also known as a 100-year floodplain).

Practicable means capable of being accomplished within existing constraints. The test of what is practicable depends on the situation and includes consideration of many factors, such as environment, cost, technology, implementation time, and postal operational needs.

Preferred area means the specific geographical area proposed for a new postal facility, as developed by the operations organization within the Postal Service. A preferred area's boundaries are unique for each proposed facility based on the operational and customer service needs of the Postal Service.

Preferred site means the most advantageous site for a proposed facility, taking into consideration postal operational and customer service needs, cost, and availability, as determined by the operations organization within the Postal Service.

Wetlands means those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.

Subpart B--Floodplain Management

Sec. 776.4 Scope.

(a) The regulations in this subpart are applicable to the following proposed postal facility actions located in a floodplain:

(1) New construction, owned or leased; or

(2) Construction projects at an existing facility that would increase the amount of impervious surface at the site.

(b) These procedures are not applicable to the following postal facility actions:

(1) Those actions identified in paragraphs (a)(1) and (a)(2) of this section, when the entire preferred area, or all contending sites, for such actions lies within a floodplain;

(2) Incidental construction, such as construction of athletic fields, recreational facilities, sidewalks, and other minor alteration projects;

(3) Construction at existing postal facilities pursuant to the Architectural Barriers Act or postal accessibility standards;

(4) Any facility construction project deemed necessary to comply with federal, state, or local health, sanitary, or safety code standards to ensure safe working conditions;

(5) Construction of facilities that are functionally dependent on water, such as piers, docks, or boat ramps;

(6) Maintenance, repair, or renovation of existing facilities; or

(7) Leasing or other use of space for not more than one year.

[[Page 56255]]

Sec. 776.5 Review procedures.

Officials shall follow the decision-making process outlined in paragraphs (a) through (f) of this section, when a facility action may involve floodplain issues. Under certain circumstances, this process may be carried out with fewer steps if all objectives of the decision- making process can be achieved. A general principle underlying this process is that a postal facility action requiring construction in a floodplain may be considered only when there is no practicable alternative.

(a) Analysis of alternatives. If a postal facility action would involve construction in a floodplain, alternative actions shall be considered.

(b) Early public notice. If a facility action at the contending site(s) could require construction in a floodplain, public notice must be provided.

(c) Floodplain location and information. (1) Personnel shall determine whether construction would occur within a floodplain. The determination shall be made by reference to appropriate Department of Housing and Urban Development (HUD) floodplain maps (sometimes referred to as Floodplain Insurance Rate Maps (FIRM)), or Federal Emergency Management Agency (FEMA) maps, or more detailed maps if available. If such maps are not available, floodplain location must be determined based on the best available information.

(2) Once the preferred site has been identified, potential floodplain impacts must be determined. As part of this determination process, specific floodplain information should be developed, which is to consider:

(i) Whether the proposed action will directly or indirectly support floodplain development;

(ii) Flood hazard and risk to lives and property;

(iii) Effects on natural and beneficial floodplain values, such as water quality maintenance, groundwater recharge, and agriculture; and

(iv) Possible measures to minimize harm to, or impact on, the floodplain.

(d) Reevaluation. After the above steps have been followed, if the determination is that there appears to be no practicable alternative to constructing in a floodplain, a further review of alternatives must be conducted by the facilities organization in conjunction with the operations organization requesting the construction of the facility. The further review of alternatives must be conducted by the operations organization for projects within the delegated authority of the Vice President, Area Operations.

(e) Final public notice. As a result of the reevaluation, if it is determined that there is no practicable alternative to constructing in a floodplain, public notice shall be provided as soon as possible for the proposed action. The notice should be publicized and should include:

(1) Identification of the project's location;

(2) Provision for a 30-day public commenting period before irrevocable action is taken by the Postal Service; and

(3) Name and complete address of a postal contact person responsible for providing further information on the decision to proceed with a facility action or construction project in a floodplain. Upon request, that person shall provide further information as follows:

(i) A description of why the proposed action must be located in a floodplain;

(ii) A listing of alternative actions considered in making the determination; and

(iii) A statement indicating whether the action conforms to applicable state and local floodplain protection standards.

(f) Distribution. The above public notice will be sent to appropriate officials, local newspapers, and other parties who express interest in the project.

(g) NEPA coordination. If either an Environmental Impact Statement or an Environmental Assessment is required under the Postal Service's National Environmental Policy Act (NEPA) regulations, the above review procedures must be incorporated into and evaluated in that document.

Sec. 776.6 Design requirements for construction.

If structures impact, are located in, or support development in a floodplain, construction must conform, at a minimum, to the standards and criteria of the National Flood Insurance Program (NFIP), except where those standards are demonstrably inappropriate for postal purposes.

Sec. 776.7 Lease, easement, right-of-way, or disposal of property to non-federal parties.

When postal property in floodplains is proposed for lease, easement, right-of-way, or disposal to non-federal public or private parties, the Postal Service shall:

(a) Reference in the conveyance document that the parcel is located in a floodplain and may be restricted in use pursuant to federal, state, or local floodplain regulations; or

(b) Withhold the property from conveyance.

Subpart C--Wetlands Protection

Sec. 776.8 Scope.

(a) The regulations in this subpart are applicable to the following proposed postal facility actions located in a wetland:

(1) New construction, owned or leased; or

(2) Construction projects at an existing facility that would alter the external configuration of the facility.

(b) These procedures are not applicable to the following postal facility actions:

(1) Construction of foot and bike trails, or boardwalks, including signs, the primary purposes of which are public education, interpretation, or enjoyment of wetland resources;

(2) Construction at existing postal facilities pursuant to the Architectural Barriers Act or postal accessibility standards;

(3) Any facility construction project deemed necessary to comply with federal, state, or local health, sanitary, or safety code standards to ensure safe working conditions;

(4) Construction of facilities that are functionally dependent on water, such as piers, docks, or boat ramps; or

(5) Maintenance, repair, or renovation of existing facilities.

Sec. 776.9 Review procedures.

(a) Early public notice. If a facility action at the contending site(s) could require construction in a wetland, public notice must be provided.

(b) Finding of no practicable alternative. The Postal Service shall avoid construction located in a wetland unless it issues a finding of no practicable alternative. The facilities organization, in conjunction with the operations organization, or, for projects within the delegated authority of the Vice President, Area Operations, the operations organization, shall make a written determination that:

(1) There is no practicable alternative to such construction; and

(2) The proposed action includes all practicable measures to minimize harm to wetlands.

(c) NEPA coordination. If either an Environmental Impact Statement or an Environmental Assessment is required under the Postal Service's National Environmental Policy Act (NEPA) regulations, the above review procedures must be incorporated into and evaluated in that document.

Sec. 776.10 Lease, easement, right-of-way, or disposal of property to non-federal parties.

When postal-owned wetlands or portions of wetlands are proposed for

[[Page 56256]]

lease, easement, right-of-way, or disposal to non-federal public or private parties, the Postal Service shall:

(a) Reference in the conveyance document that the parcel contains wetlands and may be restricted in use pursuant to federal, state, or local wetlands regulations; or

(b) Withhold the property from conveyance. Stanley F. Mires, Chief Counsel, Legislative.

[FR Doc. 99-27185Filed10-18-99; 8:45 am]

BILLING CODE 7710-12-P