Production and utilization facilities; domestic licensing: Correction,

[Federal Register: October 17, 2002 (Volume 67, Number 201)]

[Rules and Regulations]

[Page 64033]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr17oc02-1]

Rules and Regulations Federal Register

This section of the FEDERAL REGISTER contains regulatory documents having general applicability and legal effect, most of which are keyed to and codified in the Code of Federal Regulations, which is published under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. Prices of new books are listed in the first FEDERAL REGISTER issue of each week.

[[Page 64033]]

NUCLEAR REGULATORY COMMISSION

10 CFR Part 50

RIN 3150-AG61

Industry Codes and Standards; Amended Requirements: Correction

AGENCY: Nuclear Regulatory Commission.

ACTION: Final rule; correction.

SUMMARY: On September 26, 2002 (67 FR 60520), the U.S. Nuclear Regulatory Commission (NRC) published a final rule amending its regulations to incorporate by reference a later edition and addenda of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPV Code) and the ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code) to provide updated rules for construction, inservice inspection (ISI), and inservice testing (IST) of components in light-water cooled nuclear power plants. This action corrects two erroneous references to the NRC's regulations made in the supplementary information accompanying the final rule.

EFFECTIVE DATE: October 28, 2002.

FOR FURTHER INFORMATION CONTACT: Stephen Tingen, Division of Engineering, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Alternatively, you may contact Mr. Tingen at (301) 415-1280, or via e-mail at: sgt@nrc.gov.

SUPPLEMENTARY INFORMATION: In the final rule, published on September 26, 2002 (67 FR 60520), on page 60521, in the third column, in the third full paragraph, the first and second sentences are corrected to read as follows:

In responding to this clarification, several commenters indicated that the 10-year IWE and 5-year IWL examination intervals must coincide with the 120-month interval update in Sec. 50.55a(g)(4)(ii). The NRC does not agree that the 10-year IWE and 5-year IWL examination intervals must coincide with the 120-month interval update in Sec. 50.55a(g)(4)(ii).

Dated at Rockville, Maryland, this 9th day of October, 2002.

For the Nuclear Regulatory Commission. Michael T. Lesar, Federal Register Liaison Officer.

[FR Doc. 02-26342Filed10-16-02; 8:45 am]