Air quality implementation plans; approval and promulgation; various States: Georgia,

[Federal Register: June 24, 1998 (Volume 63, Number 121)]

[Proposed Rules]

[Page 34336]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr24jn98-32]

[[Page 34336]]

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[GA--035--2--9815b; FRL-6115-2]

Approval and Promulgation of Implementation Plans Georgia: Approval of Revisions for Transportation Control Measures

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

SUMMARY: EPA is proposing to approve revisions to the Georgia State Implementation Plan (SIP) submitted through the Department of Natural Resources on August 29, 1997, requesting the incorporation of five transportation control measures (TCMs). This action only addresses the incorporation of one of the five TCMs submitted for approval into the SIP. Action was taken on the other four TCMs in a separate rulemaking action. The subject of this action is an alternative fuel refueling station/park and ride transportation center project located in Douglas County.

In the final rules section of this Federal Register, the EPA is approving the State's State Implementation Plan (SIP) revision as a direct final rule without prior proposal because the EPA views this as a noncontroversial revision amendment and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this proposed rule, no further activity is contemplated in relation to this proposed rule. If EPA receives adverse comment, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based upon this proposed rule. The EPA will not institute a second comment period on this document. Any parties interested in commenting on this document should do so at this time.

DATES: To be considered, comments must be received by July 24, 1998.

ADDRESSES: Written comments on this action should be addressed to Kelly Sheckler at the Environmental Protection Agency, Region 4 Air Planning Branch, 61 Forsyth Street, SW, Atlanta, Georgia 30303. Copies of documents relative to this action are available for public inspection during normal business hours at the following locations. The interested persons wanting to examine these documents should make an appointment with the appropriate office at least 24 hours before the visiting day. Reference file GA35-9807. The Region 4 office may have additional background documents not available at the other locations.

Air and Radiation Docket and Information Center (Air Docket 6102), U.S. Environmental Protection Agency, 401 M Street, SW, Washington, DC 20460. Environmental Protection Agency, Region 4 Air Planning Branch, 61 Forsyth Street, SW, Atlanta, Georgia 30303. Attn: Kelly Sheckler, 404/ 562-9042. Georgia Department of Natural Resources, Environmental Protection Division, Air Protection Division, 4244 International Parkway, Suite 136, Atlanta, Georgia 30354.

FOR FURTHER INFORMATION CONTACT: Kelly Sheckler at 404/562-9042.

SUPPLEMENTARY INFORMATION: For additional information see the direct final rule which is published in the rules section of this Federal Register.

Authority: 42 U.S.C. 7401 et seq.

Dated: June 10, 1998.

  1. Stanley Meiburg,

Acting Regional Administrator, Region 4.

[FR Doc. 98-16803Filed6-23-98; 8:45 am]

BILLING CODE 6560-50-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT