Electric rate and corporate regulation filings: Cambridge Electric Light Co., et al.,

[Federal Register: March 12, 1999 (Volume 64, Number 48)]

[Notices]

[Page 12300-12306]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr12mr99-59]

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL96-49-007, et al.]

Cambridge Electric Light Company. et al.; Electric Rate and Corporate Regulation Filings

March 4, 1999.

Take notice that the following filings have been made with the Commission:

  1. Cambridge Electric Light Company

    [Docket No. EL96-49-007]

    Take notice that on February 26, 1999, Cambridge Electric Light Company fileda report in compliance with the Commission's Letter Order in Docket Nos. EL96-49-000, EL96-49-003, EL96-49-004 and OA96-178-000, showing monthly billing determinants, revenue receipt dates, revenues under the prior, present, and settlement rates, the monthly revenue refund, and the monthly interest computed, together with a summary of such information for the total refund period.

    Comment date: March 24, 1999, in accordance with Standard Paragraph E at the end of this notice.

  2. Cabrillo Power I LLC; Cabrillo Power II LLC

    [Docket No. EG99-78-000; Docket No. EG99-77-000 (not consolidated)]

    Take notice that on March 2, 1999, Cabrillo Power I LLC and Cabrillo Power II LLC, with their principal offices at Symphony Towers, Suite 2740, 750 B Street, San Diego, CA, filedwith the Federal Energy Regulatory Commission, amendments to their applications for determination of exempt wholesale generator status pursuant to Part 365 of the Commission's Regulations.

    The original applications filedin these dockets contained excerpts from a draft order by the Public Utilities Commission of the State of California concerning its determinations on exempt wholesale generator status for the facilities purchased by applicants. In the supplemental filing, applicants submit a final order on such status to the Commission.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the amended application.

  3. Southwestern Public Service Company

    [Docket No. ER95-1138-003]

    Take notice that on March 1, 1999, New Century Services, Inc., on behalf of Southwestern Public Service Company, tendered for filing a compliance report regarding refunds in the above-referenced docket required by the Commission's letter order issued January 22, 1999.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  4. Southwest Power Pool, Inc.

    [Docket No. ER99-783-002]

    Take notice that on March 1, 1999, Southwest Power Pool, Inc., tendered for filing revised sheets in compliance with the Federal Energy Regulatory Commission's January 29, 1999, order in this proceeding.

    Copies of this filing were served upon all parties on the Commission's official service list for this proceeding.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  5. Illinois Power Company

    [Docket No. ER99-1968-000]

    Take notice that on March 1, 1999, Illinois Power Company (Illinois Power), tendered for filing in compliance with the Order of the Federal Energy Regulatory Commission (Commission) in North American Electric Reliability Council, 85 FERC para. 61,353 (1998), and pursuant to Section 205 of the Federal Power Act, 16 U.S.C. 824d (1997), an amendment to its Initial Open Access Transmission Tariff.

    This Amendment incorporates into Illinois Power's OATT the Interim Firm Load Curtailment and Interim Regional Redispatch Plans that were adopted by the Mid-America Interconnected Network, Inc., (MAIN) and its members in compliance with ordering Paragraphs (D) and (E) of the North American Electric Reliability Council Order.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  6. CMS Generation Michigan Power, L.L.C.

    [Docket No. ER99-1970-000]

    Take notice that on March 1, 1999, CMS Generation Michigan Power, L.L.C. (Michigan Power), tendered for filing a wholesale power sales tariff to permit Michigan Power to make wholesale electric generation sales to eligible customers at up to cost-based ceiling rates.

    Michigan Power requests an effective date of May 1, 1999.

    Copies of this filing were served upon the Michigan Public Service Commission.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  7. California Independent System Operator Corporation

    [Docket No. ER99-1971-000]

    Take notice that on March 1, 1999, the California Independent System Operator Corporation (ISO), tendered for filing a proposed amendment (Amendment No. 14) to the ISO Tariff. Amendment No. 14, includes a series of proposed revisions to the ISO Tariff and Protocols that principally constitute Phase I of the ISO's comprehensive redesign of its Ancillary Service markets submitted in compliance with the Commission's October 28, 1998 order in AES Redondo Beach L.L.C., et al., 85 FERC para. 61,123 (1998). Amendment No. 14, also includes several other proposed changes to the ISO Tariff and Protocols.

    The ISO states that this filing has been served upon the Public Utilities Commission of California, the California Energy Commission, the California Electricity Oversight Board, and all parties with effective Scheduling Coordinator Service Agreements under the ISO Tariff.

    [[Page 12301]]

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  8. Allegheny Power Service Corp., on behalf of Monongahela Power Co., The Potomac Edison Company and West Penn Power Company (Allegheny Power)

    [Docket No. ER99-1977-000]

    Take notice that on March 1, 1999, Allegheny Power Service Corporation on behalf of Monongahela Power Company, The Potomac Edison Company and West Penn Power Company (Allegheny Power) tendered for filing Supplement No. 17 to add one (1) new Customer to the Market Rate Tariff under which Allegheny Power offers generation services.

    Allegheny Power requests a waiver of notice requirements to make service available as of January 2, 1999, to Green Mountain Energy Resources, LLC.

    Copies of the filing have been provided to the Public Utilities Commission of Ohio, the Pennsylvania Public Utility Commission, the Maryland Public Service Commission, the Virginia State Corporation Commission, the West Virginia Public Service Commission, and all parties of record.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  9. FirstEnergy Corp., on behalf of Pennsylvania Power Company

    [Docket No. ER99-1978-000]

    Take notice that on March 1, 1999, FirstEnergy Corp., tendered for filing on behalf of itself and Pennsylvania Power Company, a Service Agreement for Network Integration Service and an Operating Agreement for the Network Integration Transmission Service under the Pennsylvania Electric Choice Program with New Energy Ventures, Inc., pursuant to the FirstEnergy System Open Access Tariff. These agreements will enable the parties to obtain Network Integration Service under the Pennsylvania Electric Choice Program in accordance with the terms of the Tariff.

    The proposed effective date under these agreements is February 23, 1999.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  10. NGE Generation, Inc.

    [Docket No. ER99-1979-000]

    Take notice that on March 1, 1999, NGE Generation, Inc. (NGE Gen), tendered for filing pursuant to Part 35 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure, 18 CFR 35, service agreements (the Service Agreements) under which NGE Gen may provide capacity and/or energy to Avista Energy, Inc., (Avista) and DukeSolutions, Inc. (DukeSolutions), in accordance with NGE Gen's FERC Electric Tariff, Original Volume No. 1. NGE Gen's filing of the Service Agreements is subject to NGE Gen's pending application for approval of transfer filedin Docket EC99-22-000 on December 31, 1998.

    NGE Gen has requested waiver of the notice requirements so that the Service Agreement with Avista becomes effective as of February 22, 1999 and the Service Agreement with DukeSolutions becomes effective as of March 2, 1999.

    NGE Gen has served copies of the filing upon the New York State Public Service Commission, Avista, and DukeSolutions.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  11. New York State Electric & Gas Corporation

    [Docket No. ER99-1980-000]

    Take notice that on March 1, 1999, New York State Electric & Gas Corporation (NYSEG), tendered for filing pursuant to Part 35 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure, 18 CFR 35, a service agreement (the Service Agreement), under which NYSEG provide capacity and/or energy to Electric Clearinghouse, Inc. (ECI), in accordance with NYSEG's FERC Electric Tariff, Original Volume No. 1.

    NYSEG has requested waiver of the notice requirements so that the Service Agreement with ECI becomes effective as of March 2, 1999.

    NYSEG has served copies of the filing upon the New York State Public Service Commission and ECI.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  12. Northern States Power Company (Minnesota), Northern States Power Company (Wisconsin)

    [Docket No. ER99-1981-000]

    Take notice that on March 1, 1999, Northern States Power Company (Minnesota) and Northern States Power Company (Wisconsin) (Jointly NSP) filedproposed revisions to the NSP Open Access transmission Tariff (Tariff). NSP proposes to add new Schedule 9, Redispatch Service, to the NSP Tariff. Schedule 9 would provide a redispatch alternative to curtailment of firm point-to-point transmission service under the NSP Tariff. This Tariff change is submitted in compliance with ordering paragraph (E) of the Commission's December 16, 1998 order in Docket No. EL98-52-000, North American Electric Reliability Council, 85 FERC para. 61,353. NSP proposes the new Schedule 9 be accepted for filing effective May 1, 1999, in time for the 1999 Summer Season.

    NSP states it has served a copy of the filing on the utility commissions in Minnesota, Michigan, North Dakota, South Dakota and Wisconsin and on customers presently taking service under the NSP Tariff.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  13. Alliant Energy Corporate Services, Inc.

    [Docket No. ER99-1982-000]

    Take notice that on March 1, 1999, Alliant Energy Corporate Services, Inc., tendered for filing an executed Service Agreement for Network Integration Transmission Service and an executed Network Operating Agreement, establishing the Village of Pardeeville as a Network Customer under the terms of the Alliant Energy Corporate Services, Inc., open access transmission tariff.

    Alliant Energy Corporate Services, Inc., requests an effective date of March 1, 1999, for the service provided to the Village of Pardeeville. Alliant Energy Corporate Services, Inc., accordingly, seeks waiver of the Commission's notice requirements to permit the requested effective date.

    A copy of this filing has been mailed to the Illinois Commerce Commission, the Iowa Department of Commerce, the Minnesota Public Utilities Commission, and the Public Service Commission of Wisconsin.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  14. Geysers Power Company, LLC.

    [Docket No. ER99-1983-000]

    Take notice that on March 1, 1999, Geysers Power Company, LLC (Geysers Power), petitioned the Commission for acceptance of Geysers Power FERC Rate Schedule No. 1, for the sales of energy, capacity, replacement reserves, and certain ancillary services at market-based rates, the waiver of certain Commission regulations and blanket authorization of others. Geysers Power is an indirect wholly-owned subsidiary of Calpine Corporation.

    Geysers Power requests that its Rate Schedule No. 1, become effective sixty days from the date of filing.

    [[Page 12302]]

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  15. Alliant Energy Corporate Services.

    [Docket No. ER99-1984-000]

    Take notice that on March 1, 1998, Alliant Energy Corporate Services, Inc., submitted a filing on behalf of IES Utilities Inc., (IES), Interstate Power Company (IPC) and Wisconsin Power and Light Company (WPL), in response to the Commission's order dated December 16, 1998, in North American Electric Reliability Council, Docket No. EL98- 52-000.

    Alliant-East provides notice that it is adopting the Interim Firm Load Curtailment and Regional Redispatch Plans adopted by the Mid- American Interconnected Network, Inc., (MAIN).

    Alliant-West hereby provides notice that it files in support of the contemporaneous filing made by the Mid-Continent Area Power Pool in response to the NERC Order. In that filing, MAPP explains how the public utility Members of MAPP have responded to and complied with the NERC Order's requirements to file by March 1, 1999.

    A copy of this filing has been served upon the Illinois Commerce Commission, the Minnesota Public Utilities Commission, the Iowa Department of Commerce, and the Public Service Commission of Wisconsin.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  16. Montana-Dakota Utilities Co., a Division of MDU Resources Group, Inc.

    [Docket No. ER99-1985-000]

    Take notice that on March 1, 1999, Montana-Dakota Utilities Co., a division of MDU Resources Group, Inc., tendered for filing a certain agreement with Upper Missouri G&T Electric Cooperative, Inc., with a request that the Commission disclaim jurisdiction of the agreement or, in the alternative, that the commission accept the agreement for filing.

    Copies of the filing were served on the cooperative and on the interested state utility regulatory agencies.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  17. Virginia Electric and Power Company

    [Docket No. ER99-1986-000]

    Take notice that on March 1, 1999 Virginia Electric and Power Company (Virginia Power) tendered for filing a Response to the Commission's order issued on December 16, 1998 in Docket No. EL98-52- 000, North American Electric Reliability Council, 85 FERC para.61,353 (1998).

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  18. The Dayton Power and Light Company

    [Docket No. ER99-1987-000]

    Take notice that on March 1, 1999 The Dayton Power and Light Company (DP&L) submitted a compliance filing pursuant to the Commission's December 16, 1998 order in Docket No. EL98-52-000, North American Electric Reliability Council, 85 FERC para.61,353 (1998).

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  19. Oklahoma Gas and Electric Company

    [Docket No. ER99-1988-000]

    Take notice that on March 1, 1999, Oklahoma Gas and Electric Company (OG&E), tendered for filing a proposed Power Supply Service Agreement with the City of Geary, Oklahoma (Geary), a Service Agreement for Network Integration Transmission Service, and a Standard Form of Network Operating Agreement.

    OG&E also requests cancellation of its Service Agreements with the City of Geary. OG&E requests an effective date of March 18, 1999.

    Copies of this filing have been sent to City Clerk Geary Oklahoma, the Oklahoma Corporation Commission, and the Arkansas Public Service Commission.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  20. Allegheny Power Service Corp., on behalf of Monongahela Power Co., The Potomac Edison Company and West Penn Power Company (Allegheny Power)

    [Docket No. ER99-1989-000]

    Take notice that on March 1, 1999, Allegheny Power Service Corporation on behalf of Monongahela Power Company, The Potomac Edison Company and West Penn Power Company (Allegheny Power) tendered for filing Supplement No. 44, to add one (1) new Customer to the Standard Generation Service Rate Schedule under which Allegheny Power offers standard generation and emergency service on an hourly, daily, weekly, monthly or yearly basis.

    Allegheny Power requests a waiver of notice requirements to make service available as of January 2, 1999, to Green Mountain Energy Resources, LLC.

    Copies of the filing have been provided to the Public Utilities Commission of Ohio, the Pennsylvania Public Utility Commission, the Maryland Public Service Commission, the Virginia State Corporation Commission, the West Virginia Public Service Commission, and all parties of record.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  21. Entergy Services, Inc.

    [Docket No. ER99-1990-000]

    Take notice that on March 1, 1999, Entergy Services, Inc. (Entergy Services), on behalf of Entergy Arkansas, Inc. (EAI) (formerly Arkansas Power & Light Company), tendered for filing a Wholesale Formula Rate Update (Update) in accordance with the Power Coordination, Interchange and Transmission Service Agreements between EAI and the cities of West Memphis and Osceola, Arkansas (Arkansas Cities); the cities of Campbell and Thayer, Missouri (Missouri Cities), and the Arkansas Electric Cooperative Corporation (AECC); the Transmission Service Agreement between EAI and the Louisiana Energy and Power Authority (LEPA); the Transmission Service Agreement between EAI and the City of Hope, Arkansas (Hope); the Hydroelectric Power Transmission and Distribution Service Agreement between EAI and the City of North Little Rock, Arkansas (North Little Rock); the Wholesale Power Service Agreement between EAI and the City of Prescott, Arkansas (Prescott) and the Wholesale Power Service Agreement between EAI and Farmers Electric Cooperative Corporation (Farmers).

    Entergy Services states that the Update redetermines the formula rate charges and Transmission Loss Factor in accordance with: (1) the above agreements, (2) the 1994 Joint Stipulation between EAI and AECC accepted by the Commission in Docket No. ER95-49-000, as revised by the 24th Amendment to the AECC Agreement accepted by the Commission on March 26, 1996 in Docket No. ER96-1116-000, (3) the formula rate revisions accepted by the Commission on February 21, 1995 in Docket No. ER95-363-000 as applicable to the Arkansas Cities, Missouri Cities, Hope and North Little Rock and (4) the formula rate revisions as applicable to LEPA accepted by the Commission on January 10, 1997 in Docket No. ER97-257-000.

    [[Page 12303]]

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  22. American Electric Power Service Corporation

    [Docket No. ER99-1991-000]

    Take notice that on March 1, 1999, American Electric Power Service Corporation on behalf of the operating companies of the American Electric Power System (collectively AEP) filedproposed amendments to its Open Access Transmission Tariff in compliance with the Commission's December 16, 1998 Order in Docket No. EL98-52-000, North American Electric Reliability Council, 85 FERC para.61,353 (1998).

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  23. Mid-Continent Area Power Pool

    [Docket No. ER99-1992-000]

    Take notice that on March 1, 1999, the Mid-Continent Area Power Pool (MAPP), on behalf of its Members that are subject to Commission jurisdiction as public utilities, fileda response to the Commission's order in Docket No. EL98-52-000, North American Electric Reliability Council, 85 FERC para.61,353 (1998), regarding curtailments of generation to load transactions and regional redispatch solutions.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  24. Geysers Power Company, LLC

    [Docket No. ER99-1993-000]

    Take notice that on March 1, 1999, Geysers Power Company, LLC, tendered for filing amendments to the Must-Run Agreements applicable for the Geysers (Main Units) and Geysers (Units 13 and 16) Must-Run Agreements, initially filedby Pacific Gas & Electric Company. Geyser Power proposes to adopt these Must-Run Agreements and applicable rate schedules as its own. Pacific Gas and Electric Company executed a certificate of concurrence in the amendment.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  25. Carolina Power & Light Company

    [Docket No. ER99-1994-000]

    Take notice that on March 1, 1999, Carolina Power & Light Company tendered for filing a pleading in response to the Commission's directives in its December 16, 1998 Order on Petition for Declaratory Order in Docket No. EL98-52-000.

    Copies of the filing were served upon the North Carolina Utilities Commission, the South Carolina Public Service Commission and the South Carolina Public Service Authority.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  26. Idaho Power Company

    [Docket No. ER99-1995-000]

    Take notice that on March 1, 1999, Idaho Power Company (IPC), tendered for filing with the Federal Energy Regulatory Commission Service Agreements for Non-Firm Point-to-Point Transmission Service between Idaho Power Company and

  27. Cargill-Alliant, LLC 2. Merchant Energy Group of the Americas, Inc

    and Firm Point-to-Point Transmission Service between Idaho Power Company and Merchant Energy Group of the Americas, Inc., under Idaho Power Company's FERC Electric Tariff No. 5, Open Access Transmission Tariff.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  28. Madison Gas and Electric Company

    [Docket No. ER99-1996-000]

    Take notice that on March 1, 1999, Madison Gas and Electric Company (MGE) tendered for filing a Notice of Participation in Interim Firm Load Curtailment and Voluntary Regional Redispatch Plans and requested that its Open Access Transmission Tariff (MGE FERC Electric Tariff, Original Volume 1) be deemed amended accordingly. The Notice stated that MGE, as a member of the Mid-America Interconnected Network (MAIN) was obligated to operate within the Interim Firm Load Curtailment and Voluntary Regional Redispatch Plans, approved by MAIN on February 22, 1999. MGE requested an effective date coincident with its filing.

    This filing was required by the Commission by March 1, 1999 in North American Electric Reliability Council, Docket No. EL98-52-000, 85 FERC para. 61,353 (1998).

    Copies of the filing were served on all of MGE's transmission customers and on the Public Service Commission of Wisconsin.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  29. Cinergy Services, Inc.

    [Docket Nos. ER99-1997-000]

    Take notice that on March 1, 1999, Cinergy Services, Inc. tendered for filing in compliance with the Commission's December 16, 1999 Order On Petition for Declaratory Order, Docket No. EL98-52-000, North American Electric Reliability Council (NERC) Transmission Loading Relief Procedures its response to parallel flows and interim redispatch procedures.

    Cinergy states that it agrees to accept and implement NERC's procedures relating to parallel flows associated with native load and network service and its redispatch pilot program for the summer of 1999. Cinergy also states that its Open Access Transmission Tariff should be considered modified by NERC's procedures.

    Comment date: May 5, 1999, in accordance with Standard Paragraph E at the end of this notice.

  30. Western Resources, Inc.

    [Docket No. ER99-1998-000]

    Take notice that on March 1, 1999, Western Resources, Inc. filed its response to the Commission's requirements placed on transmission- operating public utilities in the Eastern Interconnection in North American Electric Reliability Council, Docket No. EL98-52-000, 85 FERC para.61,353.

    A copy of Western Resources' response was served on the Kansas Corporation Commission.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  31. Central Illinois Light Company

    [Docket No. ER99-1999-000]

    Take notice that on March 1, 1999, Central Illinois Light Company (CILCO), 300 Liberty Street, Peoria, Illinois 61202, tendered for filing with the Commission an amendment of its Open Access Transmission Tariff to incorporate the Interim Firm Load Curtailment and Regional Redispatch Plans adopted by Mid-America Interconnected Network, Inc. (MAIN) and its members in compliance with ordering paragraphs (D) and (E) of the Order on Petition for Declaratory Order in North American Electric Reliability Council, Docket No. EL98-52-000 (December 16, 1998) (TLR Order).

    Copies of the filing were served on the affected customers and the Illinois Commerce Commission.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  32. Southern Company Services, Inc.

    [Docket No. ER99-2000-000]

    Take notice that on March 1, 1999, Southern Company Services, Inc., acting on behalf of Alabama Power Company, Georgia Power Company, Gulf Power

    [[Page 12304]]

    Company, Mississippi Power Company and Savannah Electric and Power Company (collectively referred to as the Southern Companies) submitted a filing in response to the Commission's December 16, 1998 Order in Docket No. EL98-52-000.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  33. Ohio Valley Electric Corporation

    [Docket No. ER99-2001-000]

    Take notice that on March 1, 1999, Ohio Valley Electric Corporation (OVEC) in accordance with the Commission's December 16, 1998 order in North American Electric Reliability Council, Docket No. EL98-52-000, tendered for filing a statement concerning interim approaches to parallel flows associated with native load and network service, and to regional congestion problems.

    Copies of this filing were served upon OVEC's jurisdictional customers and upon each state public service commission that, to the best of OVEC's knowledge, has retail rate jurisdiction over such customers.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  34. Allegheny Power Service Corporation, on behalf of Monongahela Power Company, The Potomac Edison Company and West Penn Power Company Allegheny Power

    [Docket No. ER99-2002-000]

    Take notice that on March 1, 1999, Allegheny Power Service Corporation, on behalf of Monongahela Power Company, the Potomac Edison Company and West Penn Power Company (Allegheny Power) submitted a filing to conform to Subparts D, E, and F of the Commission's December 16, 1998 order in Docket No. EL98-52-000.

    Allegheny Power requests a March 1, 1999 effective date.

    Copies of the filing have been provided to the Public Utilities Commission of Ohio, the Pennsylvania Public Utility Commission, the Maryland Public Service Commission, the Virginia State Corporation Commission, the West Virginia Public Service Commission, and all parties of record.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  35. Niagara Mohawk Power Corporation

    [Docket No. ER99-2005-000]

    Take notice that on March 1, 1999, Niagara Mohawk Power Corporation (Niagara Mohawk), tendered for filing with the Federal Energy Regulatory Commission an executed Transmission Service Agreement between Niagara Mohawk and Rainbow Energy Marketing Corporation. This Transmission Service Agreement specifies that Rainbow Energy Marketing Corporation has signed on to and has agreed to the terms and conditions of Niagara Mohawk's Open Access Transmission Tariff as filedin Docket No. OA96-194-000. This Tariff, filedwith FERC on July 9, 1996, will allow Niagara Mohawk and Rainbow Energy Marketing Corporation to enter into separately scheduled transactions under which Niagara Mohawk will provide transmission service for Rainbow Energy Marketing Corporation as the parties may mutually agree.

    Niagara Mohawk requests an effective date of February 19, 1999. Niagara Mohawk has requested waiver of the notice requirements for good cause shown.

    Niagara Mohawk has served copies of the filing upon the New York State Public Service Commission and Rainbow Energy Marketing Corporation.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  36. East Texas Electric Cooperative, Inc.

    [Docket No. ER99-2008-000]

    Take notice that on March 1, 1999, East Texas Electric Cooperative, Inc. (ETEC) tendered for filing a letter stating that it is adopting the NERC interim TLR and redispatch policy statement filedon February 18, 1999 by the North American Electric Reliability Council in Docket Number EL98-52-000. ETEC filedits letter pursuant to the Commission's December 16, 1998 order in North American Electric Reliability Council, Docket No. EL998-52-000, 85 FERC 61,353 (1998).

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  37. Maine Public Service Company

    [Docket No. ER99-2009-000]

    Take notice that on March 1, 1999, Maine Public Service Company (MPS) submitted a notice pursuant to the Commission's December 16, 1998 order in Docket No. EL98-52-000, North American Reliability Council, indicating that it is not filing interim TLR procedures to address parallel flows or an interim redispatch plan.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  38. PJM Interconnection, L.L.C.

    [Docket No. ER99-2010-000]

    Take notice that on March 1, 1999, PJM Interconnection, L.L.C. (PJM) tendered for filing a notice regarding interim transmission loading relief procedures in response to the Commission's December 16, 1998 order in Docket No. EL98-52-000.

    Copies of this filing were served upon all PJM Members and the state electric regulatory commissions in the PJM Control Area.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  39. Duke Energy Corporation

    [Docket No. ER99-2011-000]

    Take notice that on March 1, 1999, Duke Energy Corporation (Duke) tendered for filing a compliance filing in accordance with ordering paragraphs D, E and F of the Commission's December 16, 1998 order in North American Electric Reliability Council, Docket No. EL98-52-000, 85 FERC para.61, 353 (1998). The compliance filing sets forth the procedures that Duke intends to use on an interim basis (through the summer of 1999) to implement redispatch and/or curtailments of transmission service on its system to alleviate transmission constraints.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  40. North American Electric Reliability Council

    [Docket No. ER99-2012-000]

    Take notice that on March 1, 1999, the North American Electric Reliability Council fileda response to the Commission's December 16, 1998 order in Docket No. EL98-52-000.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  41. Northern States Power Company (Minnesota), Northern States Power Company (Wisconsin)

    [Docket No. ER99-2013-000]

    Take notice that on March 1, 1999, Northern States Power Company (Minnesota) and Northern States Power Company (Wisconsin) (Jointly NSP) filedproposed revisions to the NSP Open Access Transmission Tariff (Tariff). NSP proposed to add new Attachment J--Generation to Load Curtailment Procedure, and make conforming changes to the NSP Tariff. This Tariff change is submitted in compliance with the Commission's order in Docket No. EL98-52-000,

    [[Page 12305]]

    North American Electric Reliability Council.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  42. The Detroit Edison Company and Consumers Energy Company

    [Docket No. ER99-2014-000]

    Take notice that on March 1, 1999, The Detroit Edison Company and Consumers Energy Company filednotice in response to the Commission's December 16, 1998 order in Docket No. EL98-52-000, that they intend to adopt and implement for the Summer 1999 season the interim transmission loading relief procedures and interim market redispatch program filed by the North American Electric Reliability Council.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  43. South Carolina Electric & Gas Company

    [Docket No. ER99-2016-000]

    Take notice that on March 1, 1999 South Carolina Electric & Gas Company made a filing in compliance with Ordering Paragraphs (D), (E) and (F) of the Commission's December 16, 1998 Order in Docket No. EL98- 52-000, 85 FERC para.61,353.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  44. Duquesne Light Company

    [Docket No. ER99-2015-000]

    Take notice that on March 1, 1999, pursuant to North American Electric Reliability Council, Docket No. EL98-52-000, 85 FERC para. 61,353 (1998), Duquesne Light Company filedits response addressing (i) interim Transmission Loading Relief procedures to address parallel flows associated with native load transactions and network service, (ii) interim redispatch solutions, and (iii) other concerns.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  45. UtiliCorp United Inc.

    [Docket No. ER99-2017-000]

    Take notice that on March 1, 1999, UtiliCorp United Inc. fileda response to the Commission's December 16, 1998 order in Docket No. EL98-52-000.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  46. Ameren Services Company

    [Docket No. ER99-2018-000]

    Take notice that on March 1, 1999 Ameren Services Company, on behalf of Union Electric Company and Central Illinois Public Service Company, made a filing in compliance with Ordering Paragraphs (D), (E) and (F) of the Commission's December 16, 1998 Order in Docket No. EL98- 52-000, 85 FERC para.61,353.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  47. Wisconsin Electric Power Company

    [Docket No. ER99-2019-000]

    Take notice that on March 2, 1999, Wisconsin Electric Power Company (Wisconsin Electric) tendered its compliance filing in response to the Commission's December 16, 1998 order in North American Electric Reliability Council, Docket No. EL98-52-000 (85 FERC para.61,353). The instant filing adds Attachments L and M to Wisconsin Energy Corporation Operating Companies' FERC Electric Tariff, Original Volume No. 1. Attachment L is an Interim Load Curtailment Plan responsive to Ordering Paragraph D. Attachment M is a voluntary Interim Regional Redispatch Plan that is responsive to Ordering Paragraph E of the same order.

    Copies of the filing have been served on all transmission service customers, the Michigan Public Service Commission, and the Public Service Commission of Wisconsin.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  48. Wolverine Power Supply Cooperative, Inc.

    [Docket No. ER99-2031-000]

    Take notice that on March 1, 1999, Wolverine Power Supply Cooperative, Inc. tendered for filing a letter stating that it is adopting the NERC interim TLR and redispatch policy statement filedon February 18, 1999 by the North American Electric Reliability Council in Docket Number EL98-52-000. Wolverine filedits letter pursuant to the Commission's December 16, 1998 order in North American Electric Reliability Council, Docket No. EL98-52-000.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  49. Otter Tail Power Company

    [Docket No. ER99-2030-000]

    Take notice that on March 1, 1999, Otter Tail Power Company fileda response to the Commission's order in North America Electric Reliability Council, Docket No. EL98-52-000, 85 FERC para.61,353 (1998), supporting the contemporaneous filing of the Mid-Continent Area Power Pool.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  50. Louisville Gas and Electric Company and Kentucky Utilities Company

    [Docket No. ER99-2032-000]

    Take notice that on March 1, 1999, Louisville Gas and Electric Company and Kentucky Utilities Company (the Companies) tendered for filing in response to the Commission's December 16, 1998 order in Docket No. EL98-52-000, a letter statement affirming its plan to implement the interim procedures to address parallel flows associated with native load transactions and network service.

    Comment date: March 19, 1999, in accordance with Standard Paragraph E at the end of this notice.

  51. UtiliCorp United Inc.

    [Docket No. ES99-31-000]

    Take notice that on March 1, 1999, UtiliCorp United Inc. (UtiliCorp) filedan application seeking authorization to issue corporate guaranties in an amount not to exceed one billion dollars (U.S.) in support of long-term debt and related obligations to be issued by one or more UtiliCorp subsidiaries in connection with foreign acquisition of gas and/or electric utility assets.

    UtiliCorp requests that the Commission act on or before April 1, 1999.

    Comment date: March 22, 1999, in accordance with Standard Paragraph E at the end of this notice.

  52. UtiliCorp United Inc.

    [Docket No. ES99-32-000]

    Take notice that on March 1, 1999, UtiliCorp United Inc. (UtiliCorp) filedan application seeking authorization to issue up to $205.944 million dollars (U.S.) in debt securities, in order to take advantage of the current low interest rate environment and decrease the Company's overall cost of debt. UtiliCorp requests that the Commission act on or before March 31, 1999.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

    Standard Paragraphs

    E. Any person desiring to be heard or to protest such filing should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 385.214). All such motions or

    [[Page 12306]]

    protests should be filedon or before the comment date. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of these filings are on file with the Commission and are available for public inspection. This filing may also be viewed on the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-208- 2222 for assistance). David P. Boergers, Secretary.

    [FR Doc. 99-6086Filed3-11-99; 8:45 am]

    BILLING CODE 6717-01-P