Smart Grid Policy; Requesting Supplemental Comments

Federal Register: May 21, 2009 (Volume 74, Number 97)

Proposed Rules

Page 23810-23811

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr21my09-8

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission 18 CFR Chapter I

Docket No. PL09-4-000

Smart Grid Policy; Notice Requesting Supplemental Comments

Issued May 19, 2009.

AGENCY: Federal Energy Regulatory Commission.

ACTION: Request for supplemental comments.

SUMMARY: On March 19, 2009, the Federal Energy Regulatory Commission

(Commission) issued a Proposed Policy Statement and Action Plan

(Proposed Policy Statement) that, among other things, proposed an interim rate policy to encourage the development of smart grid systems.

In this notice, the Commission seeks supplemental comments regarding rate recovery for certain smart grid investments.

DATES: Comments are due May 28, 2009.

FOR FURTHER INFORMATION CONTACT:

Ray Palmer (Technical Information), Office of Energy Policy and

Innovation, Federal Energy Regulatory Commission, 888 First Street,

NE., Washington, DC 20426, (202) 502-6569.

Elizabeth Arnold (Legal Information), Office of the General Counsel,

Federal Energy Regulatory Commission, 888 First Street, NE.,

Washington, DC 20426, (202) 502-8818.

SUPPLEMENTARY INFORMATION: 1. On March 19, 2009, the Federal Energy Regulatory Commission

(Commission) issued a Proposed Policy Statement and Action Plan

(Proposed Policy Statement) that, among other things, proposed an interim rate policy to encourage the development of Smart Grid systems.\1\ Subsequent to the Commission's issuance of the Proposed

Policy Statement, the U.S. Department of Energy (Department) announced two Smart Grid funding opportunities to be offered by the Department that may supply up to 50 percent of the funding for certain Smart Grid projects. In addition, the Department plans to require applicants to identify the source of non-Department funds, along with some evidence as to the certainty of these funds. Given that applicants for these programs might include jurisdictional public utilities that seek rate recovery through FERC-jurisdictional rates for the non-Department portion of funds for transmission-related projects, the Commission seeks supplemental comments on this matter.

\1\ Smart Grid Policy, 126 FERC ] 61,253 (2009). As the Proposed

Policy Statement described, Smart Grid advancements will apply digital technologies to the electric transmission system and enable real-time coordination of information from various resources to bring new efficiencies to the grid. Id. P 1.

  1. Background 2. In the Energy Independence and Security Act of 2007 (EISA),\2\

    Congress enacted a number of provisions related to Smart Grid. Section 1301 of the EISA states that it is the policy of the United States to support the modernization of the Nation's electricity transmission and distribution system to maintain a reliable and secure electricity infrastructure that can meet future demand growth and to achieve each of several goals and characteristics, which together characterize a

    Smart Grid.\3\ EISA authorizes the Department to carry out two separate funding programs for Smart Grid projects: (1) Providing up to 50 percent of the cost of certain demonstration projects, as described in section 1304; \4\ and (2) providing federal matching funds for Smart

    Grid investment costs, as described in section 1306.\5\ EISA also directed the development of a framework of protocols and standards to achieve interoperability of Smart Grid devices and systems, which was described in detail in the Proposed Policy Statement, and in which the

    Commission plays a role.\6\

    \2\ Public Law No. 110-140, 121 Stat. 1492 (2007).

    \3\ EISA sec. 1301, to be codified at 15 U.S.C. 17381.

    \4\ To be codified at 42 U.S.C. 17384, as amended by the

    American Recovery and Reinvestment Act of 2009, Public Law No. 111- 5, Title IV, Subpart A (ARRA).

    \5\ To be codified at 42 U.S.C. 17386, as amended by the ARRA.

    \6\ See Proposed Policy Statement, 126 FERC ] 61,253 at P 7-8.

    1. In the Proposed Policy Statement, the Commission proposed an interim rate policy for Smart Grid investments, intended to encourage investment in technologies that advance efficiency, security, reliability and interoperability. Specifically, the Commission proposed to accept single-issue rate filings submitted by public utilities under section 205 of the Federal Power Act \7\ to recover the costs of Smart

      Grid projects involving jurisdictional facilities, provided that certain showings are made.\8\ The Commission specifically noted that,

      ``[w]e would also consider applying these rate treatments to the portion of a smart grid pilot or demonstration project's cost that is not already paid for by Department of Energy funds, such as those authorized by EISA sections 1304 and 1306.'' \9\

      \7\ 16 U.S.C. 824d.

      \8\ Proposed Policy Statement, 126 FERC ] 61,253 at P 46. The

      Commission also discussed other rate treatments. Id. P 51-52.

      \9\ Id. P 52 (footnote omitted).

    2. Subsequent to the Commission's issuance of the Proposed Policy

      Statement, the Department released two documents relative to forthcoming solicitations for applications for Smart Grid funding; one of these solicitations was authorized by EISA section 1304, and one authorized by EISA section 1306.\10\

      \10\ For the section 1304 program, the Department's National

      Energy Technology Laboratory issued a Draft Funding Opportunity

      Announcement numbered DE-FOA-0000036 on April 16, 2009 (Draft

      Funding Opportunity Announcement). For the section 1306 program, the

      Department's Office of Energy Delivery and Electric Reliability issued a Notice of Intent to Issue a Funding Opportunity

      Announcement numbered DE-FOA-0000058A on April 16, 2009 (Notice of

      Intent).

    3. In the Notice of Intent, electric utilities are specifically identified as a category of eligible bidders. While the Notice of

      Intent does not specifically require that an applying electric utility get approval from a regulatory commission for non-Federal funds, the document could be read as indicating a preference for such approval.\11\

      \11\ The Notice of Intent states that the evaluation of proposals will include ``* * * the likelihood that the proposed work can be accomplished * * * with additional merit given to applications that * * * [o]ffer the greatest extent of institutional and organizational commitment with consideration given to: * * *

      r equired approvals from regulatory organizations.'' Notice of

      Intent at 12-13.

    4. The Draft Funding Opportunity Announcement does not explicitly address regulatory approvals, but does instruct applicants to submit a funding plan that identifies all sources of project funds, and directs applicants to include a commitment letter from third parties providing a specific minimum dollar amount of cost sharing.\12\ For public utilities that plan to match the Federal funds with charges to ratepayers, it is possible that public utilities may seek to obtain an order addressing rate recovery from this Commission for charges subject to this Commission's jurisdiction.

      \12\ Draft Funding Opportunity Announcement at 32-33.

  2. Request for Comments 7. Given the requirements for potential applications by public utilities

    Page 23811

    to the two Department programs referenced above, the Commission seeks comments on how it should address requests for rate recovery that may be necessary for public utilities to qualify for awards under these programs. We also seek comment on whether some form of conditional approval could be useful to public utility applicants with respect to jurisdictional Smart Grid facilities. The Commission invites comments on whether the Commission, consistent with its obligations to ensure just and reasonable rates under the Federal Power Act (FPA), should adopt processes for public utilities that may apply for funding for jurisdictional Smart Grid facilities through the Department's Smart

    Grid funding opportunities.

  3. Document Availability 8. In addition to publishing the full text of this document in the

    Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the

    Internet through FERC's Home Page (http://www.ferc.gov) and in FERC's

    Public Reference Room during normal business hours (8:30 a.m. to 5 p.m.

    Eastern time) at 888 First Street, NE., Room 2A, Washington, DC 20426. 9. From FERC's Home Page on the Internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field. 10. User assistance is available for eLibrary and the FERC's Web site during normal business hours from FERC Online Support at 202-502- 6652 (toll free at 1-866-208-3676) or e-mail at ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502- 8371, TTY (202) 502-8659. E-mail the Public Reference Room at public.referenceroom@ferc.gov.

    By the Commission.

    Kimberly D. Bose,

    Secretary.

    FR Doc. E9-12029 Filed 5-20-09; 8:45 am

    BILLING CODE 6717-01-P