Westinghouse Electric Company, LLC; Decommissioning Project, Hematite, Missouri

Federal Register, Volume 79 Issue 232 (Wednesday, December 3, 2014)

Federal Register Volume 79, Number 232 (Wednesday, December 3, 2014)

Notices

Pages 71795-71800

From the Federal Register Online via the Government Printing Office www.gpo.gov

FR Doc No: 2014-28421

-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

Docket No. 70-0036; NRC-2012-0054

Westinghouse Electric Company, LLC; Decommissioning Project, Hematite, Missouri

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; request for exemption; opportunity to request a hearing and to petition for leave to intervene; order.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has received an application from Westinghouse Electric Company, LLC dated July 11, 2014, and subsequently modified by submittal dated September 25, 2014, for amendment of the Hematite Fuel Cycle Facility license (License No. SNM-33), which authorizes decommissioning of the facility. The amendment would allow disposal of an additional 87,100 m\3\ (cubic meters) of debris and contaminated soil, concrete and asphalt, filter media, ion exchange resin and piping containing NRC-licensed source, byproduct and special nuclear material at U.S. Ecology Idaho, Inc.

DATES: A request for a hearing or petition for leave to intervene must be filed by February 2, 2015. Any potential party as defined in Sec. 2.4 of Title 10 of the Code of Federal Regulations (10 CFR) who believes access to Sensitive Unclassified Non-Safeguards Information (SUNSI) and/or Safeguards Information (SGI) is necessary to respond to this notice must request document access by December 15, 2014.

ADDRESSES: Please refer to Docket ID NRC-2012-0054 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:

Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2012-0054. Address questions about NRC dockets to Carol Gallagher; telephone: 301-287-

3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.

NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.

NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852.

FOR FURTHER INFORMATION CONTACT: John J. Hayes, Office of Nuclear Materials and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-5928; email: John.Hayes@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Introduction

The NRC has received a license amendment application from Westinghouse Electric Company, LLC (WEC or the licensee), dated July 11, 2014 (ADAMS Accession No. ML14193A008). The licensee holds NRC License No. SNM-33 and is authorized to conduct decommissioning activities at the facility. The licensee requests NRC authorization under 10 CFR

Page 71796

20.2002 for alternate disposal of an additional 87,100 m\3\ (cubic meters) of buried debris and contaminated soil, concrete and asphalt, filter media, ion exchange resin and piping containing NRC-licensed source, byproduct and special nuclear material. The amendment requests authorization for WEC to transfer decommissioning waste from the facility to U.S. Ecology Idaho, Inc. (USEI), a Resource Conservation and Recovery Act Subtitle C disposal facility, located near Grand View, Idaho. The USEI facility is regulated by the Idaho Department of Environmental Quality and is not an NRC-licensed facility.

An NRC administrative review, documented in a letter to WEC dated August 29, 2014 (ADAMS Accession No. ML14188B647), found the application acceptable to begin a technical review. On September 25, 2014, Westinghouse submitted a revision (ADAMS Accession No. ML14293A614) to their July 11, 2014, request. If the NRC approves the amendment, the approval will be documented in an amendment to NRC License No. SNM-33. However, before approving the proposed amendment, the NRC will need to make the findings required by the Atomic Energy Act of 1954, as amended, and the NRC's regulations. These findings will be documented in a Safety Evaluation Report and an Environmental Assessment.

ll. Opportunity To Request a Hearing and Petition for Leave To Intervene

Within 60 days after the date of publication of this notice, any person(s) whose interest may be affected by this action may file a request for a hearing and a petition to intervene with respect to issuance of the amendment to the subject facility operating license or combined license. Requests for hearing and petitions for leave to intervene shall be filed under 10 CFR part 2, ``Agency Rules of Practice and Procedure.'' Interested person(s) should consult a current copy of 10 CFR 2.309, ``Hearing requests, petitions to intervene, requirements for standing, and contentions,'' which is available at the NRC's PDR, located at One White Flint North, Room O1-F21, 11555 Rockville Pike (first floor), Rockville, Maryland, 20852. The NRC's regulations are accessible electronically from the NRC Library on the NRC's Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to intervene is filed within 60 days, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order.

As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements: (1) The name, address, and telephone number of the requestor or petitioner; (2) the nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding; (3) the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest. The petition must also set forth the specific contentions that the requestor/petitioner seeks to have litigated at the proceeding.

Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the requestor/

petitioner intends to rely in proving the contention at the hearing. The requestor/petitioner must also provide references to those specific sources and documents of which the petitioner is aware and on which the requestor/petitioner intends to rely to establish those facts or expert opinion. The petition must include sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the requestor/petitioner to relief. A requestor/

petitioner who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party.

Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that person's admitted contentions, including the opportunity to present evidence and to submit a cross-examination plan for cross-examination of witnesses, consistent with NRC regulations, policies, and procedures. The Atomic Safety and Licensing Board will set the time and place for any prehearing conferences and evidentiary hearings, and the appropriate notices will be provided. Petitions for leave to intervene must be filed no later than 60 days from the date of publication of this notice. Requests for hearing, petitions for leave to intervene, and motions for leave to file new or amended contentions that are filed after the 60-day deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i)-

(iii).

A State, local governmental body, Federally-recognized Indian tribe, or agency thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(h)(1). The petition should state the nature and extent of the petitioner's interest in the proceeding. The petition should be submitted to the Commission by February 2, 2015. The petition must be filed in accordance with the filing instructions in the ``Electronic Submissions (E-Filing)'' section of this document, and should meet the requirements for petitions for leave to intervene set forth in this section, except that under Sec. 2.309(h)(2) a State, local governmental body, or Federally-

recognized Indian tribe, or agency thereof does not need to address the standing requirements in 10 CFR 2.309(d) if the facility is located within its boundaries. A State, local governmental body, Federally-

recognized Indian Tribe, or agency thereof may also have the opportunity to participate under 10 CFR 2.315(c).

If a hearing is granted, any person who does not wish, or is not qualified, to become a party to the proceeding may, in the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a). A person making a limited appearance may make an oral or written statement of position on the issues, but may not otherwise participate in the proceeding. A limited appearance may be made at any session of the hearing or at any prehearing conference, subject to the limits and conditions as may be imposed by the presiding officer. Persons desiring to make a limited appearance are requested to inform the Secretary of the Commission by February 2, 2015.

Page 71797

III. Electronic Submissions (E-Filing)

All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC's E-Filing rule (72 FR 49139; August 28, 2007). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below.

To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by email at Hearing.Docket@nrc.gov, or by telephone at 301-415-1677, to request (1) a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRC-issued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket.

Information about applying for a digital ID certificate is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing the E-Submittal server are detailed in the NRC's ``Guidance for Electronic Submission,'' which is available on the agency's public Web site at http://www.nrc.gov/site-help/e-submittals.html. Participants may attempt to use other software not listed on the Web site, but should note that the NRC's E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software. If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRC's online, Web-based submission form. In order to serve documents through the Electronic Information Exchange System, users will be required to install a Web browser plug-in from the NRC's Web site. Further information on the Web-based submission form, including the installation of the Web browser plug-in, is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.

Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the documents are submitted through the NRC's E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an email notice confirming receipt of the document. The E-Filing system also distributes an email notice that provides access to the document to the NRC's Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/petition to intervene is filed so that they can obtain access to the document via the E-Filing system.

A person filing electronically using the NRC's adjudicatory E-

Filing system may seek assistance by contacting the NRC Meta System Help Desk through the ``Contact Us'' link located on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html, by email to MSHD.Resrouce@nrc.gov or by a toll-free call at 1-866-672-7640. The NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, excluding government holidays.

Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists.

Documents submitted in adjudicatory proceedings will appear in the NRC's electronic hearing docket which is available to the public at http://ehd1.nrc.gov/ehd/, unless excluded under an order of the Commission, or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. However, a request to intervene will require including information on local residence in order to demonstrate a proximity assertion of interest in the proceeding. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission.

Order Imposing Procedures for Access to Sensitive Unclassified Non-

Safeguards Information and Safeguards Information for Contention Preparation

  1. This Order contains instructions regarding how potential parties to this proceeding may request access to documents containing sensitive unclassified information (including Sensitive Unclassified Non-

    Safeguards Information (SUNSI) and Safeguards Information (SGI)). Requirements for access to SGI are primarily set forth in 10 CFR parts 2 and 73. Nothing in this

    Page 71798

    Order is intended to conflict with the SGI regulations.

  2. Within 10 days after publication of this notice of hearing and opportunity to petition for leave to intervene, any potential party who believes access to SUNSI or SGI is necessary to respond to this notice may request access to SUNSI or SGI. A ``potential party'' is any person who intends to participate as a party by demonstrating standing and filing an admissible contention under 10 CFR 2.309. Requests for access to SUNSI or SGI submitted later than 10 days after publication will not be considered absent a showing of good cause for the late filing, addressing why the request could not have been filed earlier.

  3. The requestor shall submit a letter requesting permission to access SUNSI, SGI, or both to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff, and provide a copy to the Associate General Counsel for Hearings, Enforcement and Administration, Office of the General Counsel, Washington, DC 20555-0001. The expedited delivery or courier mail address for both offices is: U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland, 20852. The email address for the Office of the Secretary and the Office of the General Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov, respectively.\1\ The request must include the following information:

    ---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this proceeding must comply with the filing requirements of the NRC's E-

    Filing Rule,'' the initial request to access SUNSI and/or SGI under these procedures should be submitted as described in this paragraph.

    ---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this Federal Register notice;

    (2) The name and address of the potential party and a description of the potential party's particularized interest that could be harmed by the action identified in C. (1);

    (3) If the request is for SUNSI, the identity of the individual or entity requesting access to SUNSI and the requestor's basis for the need for the information in order to meaningfully participate in this adjudicatory proceeding. In particular, the request must explain why publicly-available versions of the information requested would not be sufficient to provide the basis and specificity for a proffered contention; and

    (4) If the request is for SGI, the identity of each individual who would have access to SGI if the request is granted, including the identity of any expert, consultant, or assistant who will aid the requestor in evaluating the SGI. In addition, the request must contain the following information:

    (a) A statement that explains each individual's ``need to know'' the SGI, as required by 10 CFR 73.2 and 10 CFR 73.22(b)(1). Consistent with the definition of ``need to know'' as stated in 10 CFR 73.2, the statement must explain:

    (i) Specifically why the requestor believes that the information is necessary to enable the requestor to proffer and/or adjudicate a specific contention in this proceeding; \2\ and

    ---------------------------------------------------------------------------

    \2\ Broad SGI requests under these procedures are unlikely to meet the standard for need to know; furthermore, staff redaction of information from requested documents before their release may be appropriate to comport with this requirement. These procedures do not authorize unrestricted disclosure or less scrutiny of a requestor's need to know than ordinarily would be applied in connection with an already-admitted contention or non-adjudicatory access to SGI.

    ---------------------------------------------------------------------------

    (ii) The technical competence (demonstrable knowledge, skill, training or education) of the requestor to effectively utilize the requested SGI to provide the basis and specificity for a proffered contention. The technical competence of a potential party or its counsel may be shown by reliance on a qualified expert, consultant, or assistant who satisfies these criteria.

    (b) A completed Form SF-85, ``Questionnaire for Non-Sensitive Positions'' for each individual who would have access to SGI. The completed Form SF-85 will be used by the Office of Administration to conduct the background check required for access to SGI, as required by 10 CFR part 2, subpart G and 10 CFR 73.22(b)(2), to determine the requestor's trustworthiness and reliability. For security reasons, Form SF-85 can only be submitted electronically through the electronic questionnaire for investigations processing (e-QIP) Web site, a secure Web site that is owned and operated by the Office of Personnel Management. To obtain online access to the form, the requestor should contact the NRC's Office of Administration at 301-415-7000.\3\

    ---------------------------------------------------------------------------

    \3\ The requestor will be asked to provide his or her full name, social security number, date and place of birth, telephone number, and email address. After providing this information, the requestor usually should be able to obtain access to the online form within one business day.

    ---------------------------------------------------------------------------

    (c) A completed Form FD-258 (fingerprint card), signed in original ink, and submitted in accordance with 10 CFR 73.57(d). Copies of Form FD-258 may be obtained by writing the Office of Information Services, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by calling 630-829-9565, or by email to Forms.Resource@nrc.gov. The fingerprint card will be used to satisfy the requirements of 10 CFR part 2, 10 CFR 73.22(b)(1), as well as Section 149 of the Atomic Energy Act of 1954, as amended, which mandates that all persons with access to SGI must be fingerprinted for an FBI identification and criminal history records check.

    (d) A check or money order payable in the amount of $238.00 \4\ to the U.S. Nuclear Regulatory Commission for each individual for whom the request for access has been submitted.

    ---------------------------------------------------------------------------

    \4\ This fee is subject to change pursuant to the Office of Personnel Managements adjustable billing rates.

    ---------------------------------------------------------------------------

    (e) If the requestor or any individual who will have access to SGI believes they belong to one or more of the categories of individuals that are exempt from the criminal history records check and background check requirements in 10 CFR 73.59, the requestor should also provide a statement identifying which exemption the requestor is invoking and explaining the requestor's basis for believing that the exemption applies. While processing the request, the Office of Administration, Personnel Security Branch, will make final determination whether the claimed exemption applies. Alternatively, the requestor may contact the Office of Administration for an evaluation of their exemption status prior to submitting their request. Persons who are exempt from the background check are not required to complete the SF-85 or Form FD-258; however, all other requirements for access to SGI, including the need to know, are still applicable.

    Note: Copies of documents and materials required by paragraphs C. (4)(b), (c), and (d) of this Order must be sent to the following address: U.S. Nuclear Regulatory Commission, ATTN: Personnel Security Branch, Mail Stop TWFN-03-B46M, 11555 Rockville Pike, Rockville, MD 20852.

    These documents and materials should not be included with the request letter to the Office of the Secretary, but the request letter should state that the forms and fees have been submitted as required.

  4. To avoid delays in processing requests for access to SGI, the requestor should review all submitted materials for completeness and accuracy (including legibility) before submitting them to the NRC. The NRC will return incomplete packages to the sender without processing.

  5. Based on an evaluation of the information submitted under paragraphs C.(3) or C.(4) above, as applicable, the NRC staff will determine within 10 days of receipt of the request whether:

    Page 71799

    (1) There is a reasonable basis to believe the petitioner is likely to establish standing to participate in this NRC proceeding; and

    (2) The requestor has established a legitimate need for access to SUNSI or need to know the SGI requested.

  6. For requests for access to SUNSI, if the NRC staff determines that the requestor satisfies both E. (1) and E. (2) above, the NRC staff will notify the requestor in writing that access to SUNSI has been granted. The written notification will contain instructions on how the requestor may obtain copies of the requested documents, and any other conditions that may apply to access to those documents. These conditions may include, but are not limited to, the signing of a Non-

    Disclosure Agreement or Affidavit, or Protective Order setting forth terms and conditions to prevent the unauthorized or inadvertent disclosure of SUNSI by each individual who will be granted access to SUNSI.\5\

    ---------------------------------------------------------------------------

    \5\ Any motion for Protective Order or draft Non-Disclosure Affidavit or Agreement for SUNSI must be filed with the presiding officer or the Chief Administrative Judge if the presiding officer has not yet been designated, within 30 days of the deadline for the receipt of the written access request.

    ---------------------------------------------------------------------------

  7. For requests for access to SGI, if the NRC staff determines that the requestor has satisfied both E.(1) and E.(2) above, the Office of Administration will then determine, based upon completion of the background check, whether the proposed recipient is trustworthy and reliable, as required for access to SGI by 10 CFR 73.22(b). If the Office of Administration determines that the individual or individuals are trustworthy and reliable, the NRC will promptly notify the requestor in writing. The notification will provide the names of approved individuals as well as the conditions under which the SGI will be provided. Those conditions may include, but not be limited to, the signing of a Non-Disclosure Agreement or Affidavit, or Protective Order \6\ by each individual who will be granted access to SGI.

    ---------------------------------------------------------------------------

    \6\ Any motion for Protective Order or draft Non-Disclosure Affidavit or Agreement for SGI must be filed with the presiding officer or the Chief Administrative Judge if the presiding officer has not yet been designated, within 180 days of the deadline for the receipt of the written access request.

    ---------------------------------------------------------------------------

  8. Release and Storage of SGI. Prior to providing SGI to the requestor, the NRC staff will conduct (as necessary) an inspection to confirm that the recipient's information protection system is sufficient to satisfy the requirements of 10 CFR 73.22. Alternatively, recipients may opt to view SGI at an approved SGI storage location rather than establish their own SGI protection program to meet SGI protection requirements.

    I. Filing of Contentions. Any contentions in these proceedings that are based upon the information received as a result of the request made for SUNSI or SGI must be filed by the requestor no later than 25 days after the requestor is granted access to that information. However, if more than 25 days remain between the date the petitioner is granted access to the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI or SGI contentions by that later deadline.

  9. Review of Denials of Access.

    (1) If the request for access to SUNSI or SGI is denied by the NRC staff either after a determination on standing and requisite need, or after a determination on trustworthiness and reliability, the NRC staff shall immediately notify the requestor in writing, briefly stating the reason or reasons for the denial.

    (2) Before the Office of Administration makes an adverse determination regarding the proposed recipient(s) trustworthiness and reliability for access to SGI, the Office of Administration, in accordance with 10 CFR 2.705(c)(3)(iii), must provide the proposed recipient(s) any records that were considered in the trustworthiness and reliability determination, including those required to be provided under 10 CFR 73.57(e)(1), so that the proposed recipient(s) have an opportunity to correct or explain the record.

    (3) The requestor may challenge the NRC staff's adverse determination with respect to access to SUNSI by filing a challenge within 5 days of receipt of that determination with: (a) The presiding officer designated in this proceeding; (b) if no presiding officer has been appointed, the Chief Administrative Judge, or if he or she is unavailable, another administrative judge, or an Administrative Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another officer has been designated to rule on information access issues, with that officer.

    (4) The requestor may challenge the NRC staff's or Office of Administration's adverse determination with respect to access to SGI by filing a request for review in accordance with 10 CFR 2.705(c)(3)(iv). Further appeals of decisions under this paragraph must be made pursuant to 10 CFR 2.311, ``Interlocutory review of rulings on requests for hearings/petitions to intervene, selection of hearing procedures, and requests by potential parties for access to sensitive unclassified non-

    safeguards information and safeguards information.''

  10. Review of Grants of Access. A party other than the requestor may challenge an NRC staff determination granting access to SUNSI or SGI whose release would harm that party's interest independent of the proceeding. Such a challenge must be filed with the Chief Administrative Judge within 5 days of the notification by the NRC staff of its grant of access.

    If challenges to the NRC staff determinations are filed, these procedures give way to the normal process for litigating disputes concerning access to information. The availability of interlocutory review by the Commission of orders ruling on such NRC staff determinations (whether granting or denying access) is governed by 10 CFR 2.311.\7\

    ---------------------------------------------------------------------------

    \7\ Requestors should note that the filing requirements of the NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals of NRC staff determinations (because they must be served on a presiding officer or the Commission, as applicable), but not to the initial SUNSI/SGI request submitted to the NRC staff under these procedures.

    ---------------------------------------------------------------------------

    L. The Commission expects that the NRC staff and presiding officers (and any other reviewing officers) will consider and resolve requests for access to SUNSI or SGI, and motions for protective orders, in a timely fashion in order to minimize any unnecessary delays in identifying those petitioners who have standing and who have propounded contentions meeting the specificity and basis requirements in 10 CFR part 2. The attachment to this Order summarizes the general target schedule for processing and resolving requests under these procedures.

    It is so ordered.

    Dated at Rockville, Maryland, this 24th day of November, 2014.

    For the Nuclear Regulatory Commission.

    Annette L. Vietti-Cook,

    Secretary of the Commission.

    Page 71800

    Attachment 1--General Target Schedule for Processing and Resolving

    Requests for Access to Sensitive Unclassified Non-Safeguards Information

    and Safeguards Information in This Proceeding

    ------------------------------------------------------------------------

    Day Event/activity

    ------------------------------------------------------------------------

    0........................ Publication of Federal Register notice of

    hearing and opportunity to petition for

    leave to intervene, including order with

    instructions for access requests.

    10....................... Deadline for submitting requests for access

    to Sensitive Unclassified Non Safeguards

    Information (SUNSI) and/or Safeguards

    Information (SGI) with information:

    supporting the standing of a potential party

    identified by name and address; describing

    the need for the information in order for

    the potential party to participate

    meaningfully in an adjudicatory proceeding;

    demonstrating that access should be granted

    (e.g., showing technical competence for

    access to SGI); and, for SGI, including

    application fee for fingerprint/background

    check.

    60....................... Deadline for submitting petition for

    intervention containing: (i) Demonstration

    of standing; (ii) all contentions whose

    formulation does not require access to SUNSI

    and/or SGI (+25 Answers to petition for

    intervention; +7 requestor/petitioner

    reply).

    20....................... U.S. Nuclear Regulatory Commission (NRC)

    staff informs the requestor of the staff's

    determination whether the request for access

    provides a reasonable basis to believe

    standing can be established and shows (1)

    need for SUNSI or (2) need to know for SGI.

    (For SUNSI, NRC staff also informs any party

    to the proceeding whose interest independent

    of the proceeding would be harmed by the

    release of the information.) If NRC staff

    makes the finding of need for SUNSI and

    likelihood of standing, NRC staff begins

    document processing (preparation of

    redactions or review of redacted documents).

    If NRC staff makes the finding of need to

    know for SGI and likelihood of standing, NRC

    staff begins background check (including

    fingerprinting for a criminal history

    records check), information processing

    (preparation of redactions or review of

    redacted documents), and readiness

    inspections.

    25....................... If NRC staff finds no ``need,'' no ``need to

    know,'' or no likelihood of standing, the

    deadline for requestor/petitioner to file a

    motion seeking a ruling to reverse the NRC

    staff's denial of access; NRC staff files

    copy of access determination with the

    presiding officer (or Chief Administrative

    Judge or other designated officer, as

    appropriate). If NRC staff finds ``need''

    for SUNSI, the deadline for any party to the

    proceeding whose interest independent of the

    proceeding would be harmed by the release of

    the information to file a motion seeking a

    ruling to reverse the NRC staff's grant of

    access.

    30....................... Deadline for NRC staff reply to motions to

    reverse NRC staff determination(s).

    40....................... (Receipt +30) If NRC staff finds standing and

    need for SUNSI, deadline for NRC staff to

    complete information processing and file

    motion for Protective Order and draft Non-

    Disclosure Affidavit. Deadline for applicant/

    licensee to file Non-Disclosure Agreement

    for SUNSI.

    190...................... (Receipt +180) If NRC staff finds standing,

    need to know for SGI, and trustworthiness

    and reliability, deadline for NRC staff to

    file motion for Protective Order and draft

    Non-disclosure Affidavit (or to make a

    determination that the proposed recipient of

    SGI is not trustworthy or reliable). Note:

    Before the Office of Administration makes an

    adverse determination regarding access to

    SGI, the proposed recipient must be provided

    an opportunity to correct or explain

    information.

    205...................... Deadline for petitioner to seek reversal of a

    final adverse NRC staff trustworthiness or

    reliability determination either before the

    presiding officer or another designated

    officer under 10 CFR 2.705(c)(3)(iv).

    A........................ If access granted: Issuance of presiding

    officer or other designated officer decision

    on motion for protective order for access to

    sensitive information (including schedule

    for providing access and submission of

    contentions) or decision reversing a final

    adverse determination by the NRC staff.

    A + 3.................... Deadline for filing executed Non-Disclosure

    Affidavits. Access provided to SUNSI and/or

    SGI consistent with decision issuing the

    protective order.

    A + 28................... Deadline for submission of contentions whose

    development depends upon access to SUNSI and/

    or SGI. However, if more than 25 days remain

    between the petitioner's receipt of (or

    access to) the information and the deadline

    for filing all other contentions (as

    established in the notice of hearing or

    opportunity for hearing), the petitioner may

    file its SUNSI or SGI contentions by that

    later deadline.

    A + 53................... (Contention receipt +25) Answers to

    contentions whose development depends upon

    access to SUNSI and/or SGI.

    A + 60................... (Answer receipt +7) Petitioner/Intervenor

    reply to answers.

    >A + 60.................. Decision on contention admission.

    ------------------------------------------------------------------------

    FR Doc. 2014-28421 Filed 12-2-14; 8:45 am